Installation Manual
H2ODegree.com | 9
Wiring
Step 2.9: If you do not have a C-wire, insert the (4)
AA baeries included with your T-1000 thermostat
according to their correct polarizaon markings
found on the T-1000.
Securely fasten T-1000 onto its base. Once it has
clicked into place, return power to your heang
and cooling system.
Note: If baeries are installed, you must replace all baeries with only
premium brand alkaline baeries at least once every two years.
To replace the baeries, remove the T-1000 from it’s base (ie
disconnecng it from its supply mains) and insert (4) AA premium
brand alkaline baeries. If you discover leaky or damaged baeries, do
not touch the baeries. Leaky or damaged baeries must be handled
with proper safety equipment included safety glasses with side shields,
and neoprene or natural rubber gloves in a well-venlated room.
For disposal of baeries, abide by the local laws and regulaons of your
region. If you are not able to idenfy the applicable rules in your area,
please check the instrucons of the baery manufacturer.
For disposal of T-1000, you must remove baeries prior to disposal.
INSTALLATION
2. WIRING