Installation Manual

H2ODegree.com | 9
Wiring
Step 2.9: If you do not have a C-wire, insert the (4)
AA baeries included with your T-1000 thermostat
according to their correct polarizaon markings
found on the T-1000.
Securely fasten T-1000 onto its base. Once it has
clicked into place, return power to your heang
and cooling system.
Note: If baeries are installed, you must replace all baeries with only
premium brand alkaline baeries at least once every two years.
To replace the baeries, remove the T-1000 from its base (ie
disconnecng it from its supply mains) and insert (4) AA premium
brand alkaline baeries. If you discover leaky or damaged baeries, do
not touch the baeries. Leaky or damaged baeries must be handled
with proper safety equipment included safety glasses with side shields,
and neoprene or natural rubber gloves in a well-venlated room.
For disposal of baeries, abide by the local laws and regulaons of your
region. If you are not able to idenfy the applicable rules in your area,
please check the instrucons of the baery manufacturer.
For disposal of T-1000, you must remove baeries prior to disposal.
INSTALLATION
2. WIRING