Installation & Assembly
JONATHAN
ADLER
ENTERPRISES
•
333 HUDSON STREET 7TH FLOOR NY, NY 10013
•
T. 212.645.2802 F. 212.645.3072
•
jonathanadler.com
3. Turn over the Cushion Seat (B) on the ground and put the Base (A) upside down onto the Bottom of
Cushion Seat (B). Secure Screw ② into drilled hole using Allen Wrench ③ to assemble Base (A)
and Cushion Seat (B) tightly. Make sure the lowest side of top plate sits behind.
4. Turn back the assembled chair on the ground and adjust the Levelers ① if needed to have
the Base (A) stay level. Assembly is completed.
Ensure all bolts are fully tightened every three months to ensure stability.
Lowest Side
B
②
①
A


