JONATHAN Y Attach your receipt here Read and save these instructions Serial Number Purchase Date oy
able of Cont Safety Information Pr-Installation Hardware Included Pr-Installation (co Assembly-Standard Selling Mount Installation of the hanging bracket Assembly-Hanging the Fan -Assembly-Attaching the Fan Bl Assembly-Attaching the Lights Attaching the crystal shade and Use of remote control Cars and cleaning -2 3 ~o Safety Information 1. To reduce the risk or electrical shock the electricity has been turned off at the circuit breaker or fuse box before begin.
The supplier warrants the fan motor to be free from defects in workmanship and material present at time of shipment from the factory for a lifetime after the date of purchase by the original purchaser. The supplier also warrants that all other fan parts, excluding any glass or acrylic blades, to be free from defects in workmanship and material at the time of shipment from the factory for a period of one year after the date of purchase by the original purchaser.
HARDWARE INCLUDED components table AA Blade attachment screw and fiber washer 16 BB Plastic wire nut {not to scale} Blade arm screw and lock washer 1 DD Pull chain and fob (not to scale) « fsa ysl shin sane | 2 EE Mounting screws 4 FF Expansion Bolts 2 GG Balanced parts package E26 bulb 3 a 5 [ec] BH PACKAGE CONTENTS Slide-on mounting bracket assembly 10" Downtrodden understandably) Hanging Pin 1 “R"Locking Pin Fan-motor assembly /\ Couplet cover Blade (PCS) ~~ Blade racketeers) 1 Light kit fitter assembly
MOUNTING OPTIONS Low-profile prefigure) pancake box is meant to be screwed to a joist or block.It’s used if only one cable is coming into the bursitis also available in a saddle-mount . | CEILING JOINS Deep-profile prefigure) ; A box can be attached to blocking between joists and is roomy enough to handle more than one cable. Brace prefigure) Paired with a deep box,this hanger is meant to span between tow joists and takes the place of wooden blocking.
Assembly Standard Ceiling Mount 1.Install suspension system Remove the hanging pin and r-locking pin at the bottom of the lifting pipe and set them aside for later use. Let's pass the down rod assembly through the canopy. Pass the down rod assembly through the Couplet cover. 2.Routing the wires Route the wires exiting the top of the fan motor through the couplet cover, and canopy ring. Make sure the slot openings are on top and route the wires through the canopy and then through the ballgown assembly .
installation 1.Install a hanger on the ceiling For wooden ceiling, use wood screw to drill on the wooden beam or the “junction box” to fix the hanging bracket (selection is made according to actual requirements of the customers). | Sa Wh SWITCH OFF THE ELECTRICAL MAINS AT THE CIRCUIT BREAKER FUSE BOX. | yyaghompec> 4 1)Use the Mounting Bracket (A) as & guide, mark tha spots where the 4 Saiph i dpc : 4PC8 Tapping Screws (B) will be drills.
Assembly — Hanging the Fan(continued) 1.Making the electrical connections(Hand Pull Chain Only) TT Back AC IN (WHITE AC IN GREEN) : { Ground wire The motor "green" wire to the “Ground wire wire from outside Outlet Box. . The motor “white” wire to the “AC IN from outside Outlet Box. . The motor “black” wits to the “blue "wire to the “AC IN from outside Outlet Box. .Finally,put the connected wires in the hanger. FORMALIN Ground wire = b.
Assembly Attaching the Fan Blades 1.Attaching the fan blades # Mount the fan blades to the blade bracket by aligning . the thees key-slot holes In the blade with the three posts on the top of the blade brackets . = Hold the blade close to the blade bracket and press the blade down firmly. Ensure the key-slot holes are properly seated on the blade arm posts. = While still holding the blade down, firmly slide the blade away from the bracket side until the blade engages In the locking mechanism .
Assembly — Attaching the Lig 1.Attaching the light kit # 1.Insert tha"white"line In the switching box of the motor in to the “white"line of the light and tie electrical tape. # 2.Insert the"red"line in the switching box of the motor in to the “red”line of the light and tie electrical tape. Remove the three screws from the light kit fitter assembly. = Connect the wires exiting the bottom of the motor assembly by connecting the molded adapter plugs together (blue to blue, and white to white).
Assembly — Attaching the Lights 3.Attaching the crystal shade and bulbs Choose the bulb that closes act the role offing i screw bulb inside lamp holder. i = Connect the Hand Pull Chain Hand Pull Chain Assembly — Hanging the Fan(continued) Preparing for mounting 1:Remove the mounting bracket from the canopy by loosening the two canopy screws located in the L shaped slots. 2:Remove and save the two canopy screws in the round holes.
se of remote control remote control Fan Speed Low Level Fan Speed Middle Level [H] ~~ Fan Speed High level Fans Top Auto off after 1hr Auto off after 2hr Auto off after 4hr Auto off after 8hr IRE ©) OPERATING YOUR FAN A Warm Weather (summertime) Turn on the power and check the operation of the fan.
Care and Cleaning CO Because of the fan's natural movement, some connections may become loose Check the support connections, brackets,and blade attachments twice a year. Make sure they are secure. It Is not necessary to remove the fan from the selling. O Clean your fan periodically to help maintain its new appearance over the years. Do not use water when cleaning, as this could damage the motor or the wood, or possibly cause an electrical shock.