Installation Instructions

Premier Vanity
Assembly Instructions
This assembly instruction applies to all V3621D-R, V3621D-L, V4221D-R, and V4221D-L
485 Commerce Dr.
Fall River, MA 02720
Parts included:
Cabinet Items
Qty
A
Face Frame with Door
1x
B
Side Panel
(Left and Right)
2 x
C
Bottom Panel
1 x
D
Back Panel
1 x
E
Toe Kick
1 x
F
Drawer Front
2 x
G
Drawer Box
2 x
H
Corner Bracket
4 x
I
Hinges
4x
J
Toe kick bracket
2x
Drawer Items
Qty
K
Drawer Rail
Holder
4 x
L
Drawer Rail Set
(left and right)
2 x
M
Drawer Clips
(left and right)
2 x
N
Metal Bracket
6 x
O
1/2” Pan Head
8 x
P
1/2” Flat Head
22 x
Q
1” Flat Head
4 x
R
1/2” Round Head
8 x
S
5/8” Round Head
4 x
T
7/8” Flat Head
8 x

Summary of content (5 pages)