Operation Instruction

14
to reference point 2, when the upper left corner of interface indicates "set up the second
reference point". Click direction keys to move the frame so that reference point 2 coincides
with the position of template B. To return to re-set reference point 1, click key to
switch to reference point 1 for setup.
3) Click to finish the setup of reference point 2, when the system automatically returns
to the main interface of processing. The system will write this position into processing file,
while the processing preview area pattern will be adjusted to correspond to the position of
template. Upon the completion of reference point alignment, additional alignment is not
needed as long as you don't modify this file and template. If the upper computer does not set
up dual reference points, the sewing start point will be taken as reference point 1 by default,
in which case the system will return to main interface of processing after the alignment of
reference 1. By setting up system parameters, it is possible that reference alignment is not
needed at the first use. Please consult the manufacturer for detailed settings.
Process Statistics Interface Display Instruction
Click or in the main interface of processing to enter the processing
statistics interface. In this interface, you can view the processing quantity, time, bottom thread length
and other information.
The interface is described as follows:
Total number of files completed by history: The number on the left represents the total
number of processing times accumulated; The number on the right represents the total number of
processing times in 7 days of the current figure. Click "Clear" to clear the total number of both
processing times and 7 days of the current graphics.