User Manual
41
6 Commissioning/start-up
6.1 Quick introduction
How to proceed:
TIP!
This is a proposal to be able to configure the device reliably within a short time. When check-
ing the setting possibilities specified in this list prior to starting configuration, timeouts can be
avoided during configuration.
Step Activity
1 Install the device.
Chapter 4 "Installation", page 27
2 Connect the device.
Chapter 3 "Electrical connection", page 21
3 Unlock the device.
Chapter 6.2 "Unlocking the device (enter the code).", page 42
4 Select the unit of the measured value.
Chapter 6.4 "Setting the unit of the measured value (Uni.T)", page 44
5 Set the output signal.
Chapter 6.8 "Setting the output signal (S.Type)", page 47
6 Set the output signal scaling.
Chapter 6.9 "Setting the output signal scaling", page 48
7 Set the switching function.
Chapter 6.12 "Setting the switching function (B.Fct)", page 55
8 Set the switching point.
Chapter 6.13 "Setting the switching point (B.Sp)", page 59
9 Set the release point.
Chapter 6.14 "Setting the release point (B.RSp)", page 60