Manual

22
CI-101A (Rev B) JUN-AIR Dental Compressed Air System User Guide
© 2011, JUN-AIR
We reserve the right to make any alterations which may be due to any technical improvements
Printed in the USA
INSTALLATION CHECKLIST
o Check system for shipping damage
o Remove packaging materials
o Verify installation kit components
o Remove skid mounting hardware and re-attach nuts to shock mounts
o Install intake filter assemblies
o Relocate unit to operating location and place per “SITE REQUIREMENTS”
o Attach pneumatic ttings and connections per “SITE REQUIREMENTS” and “INSTALLATION-
PLUMBING CONNECTIONS”
o Install drain tubing to system and secure opposite end to floor drain
o Attach electrical connections per “SITE REQUIREMENTS” and “INSTALLATION -ELECTRICAL”
o Verify incoming line voltage is minimum of 208 V and maximum of 253 V
o Turn on power to dedicated circuit and ensure unit starts. If not, refer to “TROUBLESHOOTING
GUIDE”
o Check for system and operatory leaks per “SYSTEM CHECKS AND TESTS”
o Check system pump-up and recovery times per “SYSTEM CHECKS AND TESTS”