Table 20: Site Preparation Checklist for the SRX210 Services Gateway
Installation (continued)
Date
and
NotesAdditional InformationItem or Task
“SRX210 Services Gateway Site
Electrical Wiring Guidelines” on
page 157
“SRX210 Services Gateway Power
Specifications and Requirements”
on page 158
■
Measure distance between external power
sources and device installation site.
■
Locate sites for connection of system
grounding.
■
Calculate the power consumption and
requirements.
Rack Installation
“SRX210 Services Gateway Rack
Requirements” on page 52
■
Verify that your rack meets the minimum
requirements.
■
Plan rack location, including required space
clearances.
■
Secure the rack to the floor and building
structure.
Cabinet Installation
“SRX210 Services Gateway Cabinet
Requirements” on page 51
■
Verify that your cabinet meets the
minimum requirements.
■
Plan the cabinet location, including required
space clearances.
Wall Installation
“Preparing the SRX210 Services
Gateway for Wall-Mount
Installation” on page 68
■
Verify that the area selected meets the
minimum requirements.
■
Verify that you have the required hardware
to proceed with the installation.
Desktop Installation
“Preparing the SRX210 Services
Gateway for Desk-Mount
Installation” on page 67
■
Verify that the area selected meets the
minimum requirements.
■
Plan the installation location, including
required space clearances and airflow
requirements.
Cables
“Interface Cable and Wire
Specifications for the SRX210
Services Gateway” on page 161
■
Acquire cables and connectors.
■
Review the maximum distance allowed for
each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
■
Plan the cable routing and management.
Related Topics ■ SRX210 Services Gateway Specifications on page 7
■ General Site Guidelines for Installing the SRX210 Services Gateway on page 51
50 ■ Site Preparation Checklist for the SRX210 Services Gateway