Table 20: Site Preparation Checklist for the SRX210 Services Gateway
Installation (continued)
Date
and
NotesAdditional InformationItem or Task
SRX210 Services Gateway Site
Electrical Wiring Guidelines on
page 157
SRX210 Services Gateway Power
Specifications and Requirements
on page 158
Measure distance between external power
sources and device installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Rack Installation
SRX210 Services Gateway Rack
Requirements on page 52
Verify that your rack meets the minimum
requirements.
Plan rack location, including required space
clearances.
Secure the rack to the floor and building
structure.
Cabinet Installation
SRX210 Services Gateway Cabinet
Requirements on page 51
Verify that your cabinet meets the
minimum requirements.
Plan the cabinet location, including required
space clearances.
Wall Installation
Preparing the SRX210 Services
Gateway for Wall-Mount
Installation on page 68
Verify that the area selected meets the
minimum requirements.
Verify that you have the required hardware
to proceed with the installation.
Desktop Installation
Preparing the SRX210 Services
Gateway for Desk-Mount
Installation on page 67
Verify that the area selected meets the
minimum requirements.
Plan the installation location, including
required space clearances and airflow
requirements.
Cables
Interface Cable and Wire
Specifications for the SRX210
Services Gateway on page 161
Acquire cables and connectors.
Review the maximum distance allowed for
each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
Plan the cable routing and management.
Related Topics SRX210 Services Gateway Specifications on page 7
General Site Guidelines for Installing the SRX210 Services Gateway on page 51
50 Site Preparation Checklist for the SRX210 Services Gateway