Network Router User Manual

Related Topics Site Preparation Checklist for the SRX210 Services Gateway on page 49
Clearance Requirements for Airflow and Hardware Maintenance of the SRX210
Services Gateway on page 54
Unpacking the SRX210 Services Gateway on page 61
Preparing the SRX210 Services Gateway for Rack-Mount, Desk-Mount, and
Wall-Mount Installation on page 65
Preparing the SRX210 Services Gateway for Desk-Mount Installation on page 67
Preparing the SRX210 Services Gateway for Wall-Mount Installation on page 68
Preparing the SRX210 Services Gateway for Desk-Mount Installation
You can mount an SRX210 Services Gateway on a desk or other level surface
horizontally or vertically. The four rubber feet attached to the chassis provide stability.
Table 29 on page 67 provides the list of tasks you need to perform before installing
the device.
Table 29: SRX210 Services Gateway Preinstallation Checklist for Desk-Mount
Installation
Additional InformationTask
Site Preparation Checklist for the SRX210
Services Gateway on page 49
Verify that the site meets the requirements.
Clearance Requirements for Airflow and
Hardware Maintenance of the SRX210
Services Gateway on page 54
Place the desk in its permanent location, allowing
adequate clearance for airflow and maintenance,
and secure it to the building structure.
Unpacking the SRX210 Services
Gateway on page 61
Remove the services gateway chassis from the
shipping carton.
Verify that you have the following parts available in
your desk-mounting kit to mount the SRX210
Services Gateway vertically:
Vertical stand
Screws
NOTE: If you are mounting the services gateway horizontally on a desk, ensure that
the chassis is attached with the rubber feet.
NOTE: The vertical desk-mounting kit is not shipped with the device and must be
ordered separately.
Preparing the SRX210 Services Gateway for Desk-Mount Installation 67
Chapter 11: Preparing the SRX210 Services Gateway for Installation