User Guide
Table Of Contents
NOTE:
• The IP addresses assigned to the internal and external network ports must be allocated from dierent
subnets for both DHCP and stac conguraons.
• External Network requires two IP addresses while the internal network requires only one IP address.
6. Aer modifying the elds, click Update to apply the changes and return to the homepage (the JSI Data Collector
page).
If you want to discard your changes, click Cancel.
If the LWC connects to the gateway and DNS successfully, the respecve conguraon element (internal or external
network secon) on the JSI Data Collector homepage shows the connecon status as Gateway Connected and DNS
Connected with green ck marks against them.
The JSI Data Collector homepage displays the Connecon Status as:
• Juniper Cloud Connected if the external connecvity to the Juniper Cloud is established and the acve proxy (if
applicable) sengs are correctly congured.
• Cloud Provisioned if the device is connected to Juniper Cloud and has completed the Zero Touch Experience
(ZTE) process. Aer the Cloud connecon status becomes Juniper Cloud Connected, it takes about 10 minutes
for the provision status to become Cloud Provisioned.
The following image shows how the JSI Data Collector page appears when the LWC is connected successfully.
8










