Installation Guide

JUNO TYPE IC & TC RECESSED HOUSING INSTALLATION INSTRUCTIONS
3"
Step 1. Extend bar hangers to fit between
joists. Bar hanger foot is contoured to easily
align with bottom of joist (Fig. 3). Position
fixture by hammering Real-Nails
TM
into joists
(Fig. 4).
(Note: Bar hanger may be shortened to fit 12"
framing or smaller by breaking at score lines).
Step 2. Slide fixture along
bar hangers into desired
location. Use locking screws
or slot to secure (Fig. 5).
Step 3. Follow steps 1-4 under Electrical
Connection.
Step 4. When installing in drywall, cut
appropriate sized hole.* After installing
drywall, if necessary, adjust fixture for ceiling
thickness by loosening hex screws that
attach the round housing to the plaster
frame. (Fig. 3)
Relocating Fixture —
Nail can be removed with
hammer claw to allow easy
repositioning of fixture
without damaging bar
hanger or nail (Fig. 6).
WARNING: For your safety, read and understand instructions completely before starting installation. Before wiring to power supply, turn off electricity at the fuse or circuit breaker box.
NOTE: Juno recessed fixtures are designed to meet the latest NEC requirements and are listed in full compliance with UL1571, 1570 or 1598. Before attempting installation of any recessed lighting fixture, check your local electrical building
code. This code sets the wiring standards and installation requirements for your locality and should be understood before starting work. Use of non-Juno trims voids Juno warranty.
Juno Type IC fixtures are designed for direct
contact with insulating materials which are
approved for this application (Fig. 2). Blinking
light after installation indicates that improper
bulb or trim is being used.
Use Juno Air-Loc Gaskets or Air-Loc Rated
Trims with Juno IC housings for additional
energy savings and to comply with
Washington State and other energy codes.
*In Canada, when insulation is present, Type IC fixtures
must be used.
Installation into Joist Construction
Installation into Suspended Ceiling
Figure 7
1300 South Wolf Road • Des Plaines, IL 60018
Phone 800-323-5068 • www.junolightinggroup.com
Electrical Connection Instructions
Step 1. Provide electrical service accord-
ing to your local electrical code to the wiring
box located on the plaster frame. Supply
wire insulation must be rated for at least
90°C.
Step 2. Remove wiring box cover.
Remove the appropriate knock-out(s) to
accommodate the type of electrical service
to be used/allowed by your local electrical
code (Fig. 9):
Metal Conduit. Remove appropriate round
knock-out(s) and connect conduit to wiring
box with proper connectors (not supplied.)
Non-Metallic Cable. Remove appropriate
knock-out(s) from top of wiring box and
insert cable, pushing it past the cable grip.
No other connector is required.
Step 3.
Standard J-Box: Connect supply wires to
fixture wires with proper size wire nuts
(not supplied), so as to cover all bare
current-carrying conductors (Fig. 10).
J-Box with Quick Connectors: Strip supply
wire 3/8˝, insert each supply wire into
appropriate junction box connector. Connect
black fixture wire to hot, white fixture wire to
neutral and green fixture wire to ground
(Fig. 10).
Step 4. Place
all wiring and
connections back
in wiring box and
replace cover.
Black
Lamp Socket
Thermal Protector
White
120V
Figure 10
Figure 9
Metal Conduit
Non-
Metallic
Cable
TYPE TC & PL for Non-Insulated Ceilings
Juno Type TC & PL fixtures are designed for
installations where housing and J-Box will not
come into contact with insulation. Insulation
must be spaced 3" away from the housing and
J-Box (Fig. 1)*. Blinking light after installation
indicates that improper bulb or trim is being
used or that fixture has been improperly
covered with insulation.
TYPE IC for Insulated Ceilings
Figure 2
Figure 1
Step 1. Locate center of proposed opening on
ceiling tile and cut appropriate sized hole.*
Step 2. Place ceiling tile in T-bar grid.
Step 3. Place fixture into
position and snap bar hanger
foot with integral T-bar clips
onto T-bars (Fig. 7). Additional
holes provided for securing
with wire or screws as needed
(Fig. 8).
Step 4. Follow Steps 1-4 under Electrical
Connection.
Figure 3
Trim Installation
Install trim using coil,
leaf, torsion, or push-in
springs as provided.
Remove socket paint
protector cover and
install proper lamp as
listed on housing label.
Figure 11
© 2010 Juno Lighting LLC Rev 2/10
Figure 5
Hex Screws
P5142
* Note: Cut a 4-1/2" (for 4" housings), 5-5/8" (for 5" housings) or 6
-
-7/8" (for 6" housings) opening. For sloped
ceiling housings, use the provided oval hole template.
Figure 4
Figure 6
Figure 8
Mark means lamp contains mercury.
Follow disposal laws.
See www.lamprecycle.org
Hg
Hg

Summary of content (2 pages)