Owner's Manual

Table Of Contents
3 Protocol
9 / 45 PJ05030305B
3.9 Communication sequence
[ACK/NACK concept]
When the projector receives
a command, it returns ACK after
performs if the command is prescribed. If not, the projector returns
nothing.
[Operation sequence]
When projector receives an operation command, it returns ACK after
performs the command operation. However, if the projector receives
the command while user operation is going on, the projector returns
nothing.
[Reference sequence]
When projector receives a reference command, it returns ACK
immediately, and then transmits related information for command as
response to external controller.
If the projector receives a reference command while in user
operation, it transmits ACK immediately, and then it transmits
response command after the completion of user operation.
This is because of conflict between projector information and the
information passed to external controller via response command
based on timing, if the reference command is approved while in user
operation.
Switching to
HDMI-1
Operation
command is
canceled.
External
Controller
PJ
Input [Reference]
ACK
Input Command
[Reference]
Input [Operation] HDMI-1
ACK
Input [Response]
Input [Response]
ACK
Input [Response]
Switching to
HDMI2
.
Operation
command is
canceled.
Input [Operation]
HDMI2.
ACK
Input Command
[Operation]
Input [Operation] HDMI
-
1
ACK
Nothing to do.
Command that does
not exist
PJ
Controller
External
ACK