Installation Manual

* FREE K&N
®
decal To register your warranty, please see us online at knlters.com/register. FREE K&N
®
decal *
INSTALLATION INSTRUCTIONS
Continued
ROAD TESTING:
25. It will be necessary for all K&N
®
high ow intake
systems to be checked periodically for realignment,
clearance and tightening of all connections.
Failure to follow the above instructions or proper
maintenance may void warranty.
24. Reconnect the vehicle’s negative battery cable.
Double check to make sure everything is tight and
properly positioned before starting the vehicle.
• 1455 CITRUS ST., P.O. BOX 1329, RIVERSIDE, CA., U.S.A. 92502 • TECH SERVICE 800-858-3333 • FAX 951-826-4001
• e-mail: tech@knlters.com
®
• WWW: http://www.knlters.com
®
1. Start the engine with the transmission in neutral
or park, and the parking brake engaged. Listen for
air leaks or odd noises. For air leaks secure hoses
and connections. For odd noises, find cause and
repair before proceeding. This kit will function
identically to the factory system except for being
louder and much more responsive.
2. Test drive the vehicle. Listen for odd noises or
rattles and x as necessary.
3. If road test is ne, you can now enjoy the added
power and performance from your kit.
4. K&N Engineering, Inc., requires cleaning the
intake system’s air lter element every 100,000
miles. When used in dusty or off-road
environments, our lters will require cleaning more
often. We recommend that you visually inspect
your lter once every 25,000 miles to determine
if the screen is still visible. When the screen is no
longer visible some place on the lter element, it is
time to clean it. To clean and re-oil, purchase our
lter Recharger
®
service kit, part number 99-5050
or 99-5000 and follow the easy instructions.
19624A
2/27/14
12. Install one of the provided brackets #070812
onto the heat shield as shown using the provided
hardware.
13. Flip the heat shield over and install the
remaining bracket #070812 and secure with the
provided hardware.
14. Install the two heat shield mounts onto the
brackets as shown.
15. Install the nal heat shield mounting bracket
#07139 onto the heat shield and secure using the
provided hardware.
16. Remove the front engine mounting bolt shown.
17. Install the tube mounting bracket #064301 onto
the engine mount and secure with the factory bolt
from the previous step.
NOTE: The bracket will need to be adjusted for
best t once the kit is fully assembled.
18. Install the heat shield mounts into the factory
mounting grommets and then secure mounting
bracket to the core support with the factory air box
mounting bolt.
19. Install the provided hump hose #08696 onto
the plenum inlet and secure with the provided hose
clamp.
20. Install the crank case vent tting into the K&N
®
intake tube as shown.
NOTE: Plastic NPT ttings are easy to cross
thread. Install the vent tting “hand” tight, then
turn it two complete turns with a wrench.
21. Install the K&N
®
intake tube into the silicone
hose and align with the mounting bracket
previously installed. Secure the tube with the
provided hardware and hose clamp.
22. Connect the crank case vent hose to the tting
installed into the K&N
®
intake tube.
23.Install the K&N
®
air lter and secure with the
provided hose clamp.
NOTE: Drycharger
®
air lter wrap; part #
RX-4990DK is available to purchase separately.
To learn more about Drycharger
®
lter wraps or
look up color availability please visit
http://www.knlters.com
®
.