Installation Sheet

Sealant
Tape
5"(127 mm)
Min
Finished
Wall
Finished
Floor
2"
(51 mm)
Min
Floor
Joist
Wood Support
6" (152 mm) Min Width
3-3/8"
(86 mm)
Min
34-13/16"
(884 mm)
11-7/8"
(302 mm)
2
Roughing-In
26-3/4"
(679 mm)
3-1/2"
(89 mm)
2-1/4"
(57 mm) Min
3" (76 mm)
Max
Floor Joist
6" (152 mm) Min
1
Roughing-InNOTICE: Adequate floor support is
required. Standard 2x6 lumber is
NOT sufficient for this application.
NOTE: Concrete can be used as the
floor support.
Follow all local plumbing and building
codes.
CAUTION: Risk of personal
injury.
Do not use this product as a grab or
support bar when entering or exiting
the bath.The product is not designed
to support weight.
Record your model number.
Cold
Notch
7
Apply sealant tape to the supply
pipes and thread into the base.
The cold supply goes over the
notch.
6
Secure the base to the support
with the screws and washers.
Ø 3/16"
1-1/2"
(38 mm)
5
Using a 3/16" drill bit (provided),
drill 1-1/2" (38 mm) deep holes
at the marked locations. Use a
masonry bit if drilling into
concrete.
4
Use the base to mark the
mounting holes on the wood
support.
3
Construct a wood support under
the floor according to the
roughing-in dimensions.
12
Remove the plug from the base.
11
Cut the guard flush with the
finished floor.
Finished
Floor
Ø 3"
(76 mm)
10
Finish the floor, leaving a 3" (76
mm) diameter hole for the guard.
9
Turn off the water and secure the
guard onto the base.
8
Insert the plug into the base.Turn
on the water and check for leaks.
17
Remove the aerator. Run water
to remove debris. Reinstall the
aerator.
16
Install the handshower to the
hose.
15
Turn on the water to flush debris
from the hose.
14
Install the check valve and
handshower hose to the diverter.
13
Secure the faucet to the base
with the screws and washers.
1377349-2-A

Summary of content (2 pages)