Installation Guide

INSTALLATION INSTRUCTIONS
Toilet
1142313_2_B
3 of 9
Questions? Problems? For additional assistance, please contact KALLISTA’s Customer
Service Department at 1-888-4KALLISTA (1-888-452-5547) or FAX 1-888-272-3094.
INSTALLATION
1. Install or relocate the supply and outlet as necessary to conform to the roughing-in dimensions.
8-1/2" (216 mm)
11-13/16"
(300 mm)
16-3/16"
(411 mm)
14-3/16"
(360 mm)
34"
(864 mm)
3/8" NPT
Supply
11"
(279 mm)
7-1/2"
(191 mm)
11-5/8"
(295 mm)
6-5/8"
(168 mm)
Ø 3/8" Mounting Holes
12" (305 mm)
Minimum Rough-in
2. If replacing a toilet, remove the
old wax.
3.
Template
4. Tape in place and drill holes.
Mark here
with tape.
3/8”
5.
Anchor
8-1/2"
(216 mm)
11-13/16"
(300 mm)
3/8" NPT Supply
5" (127 mm) range for existing supply
6. Position brackets as shown on the
template and install.