Operation Manual

Generated by Unregistered Batch DOC TO PDF Converter 2011.3.804.1511, please register!
11
INSTALLATION
2. Drill hole on wall
Drill 70mm hole on the left side or right side.
3. Install the wall-through pipe
Insert the wall-through pipe into the hole.
Have 15mm of pipe outside the wall.
Use putty to seal the hole.
4. Direction of tubing
Tubing can be connected in direction of 1,2,3,4,5.
5. Tubing connection
Pull out the pipe of indoor unit and drainage hoses.
Remove fixture of pipes and pull pipes and drainage
hoses out of the indoor unit.
Straighten backward the pipes and drainage hoses.
Connect pipes
Put the taper nut in the center of the pipe, then fasten
it.
Fasten the nut tight with a spanner.
Pipe size
Torque
6
1.8kg. m
12
5.5kg.m
6. Fix indoor unit
Put the indoor unit on the upper part of the AC-fixing
board, make the two hooks of the indoor unit well
match with the upper part of the AC-fixing board.
Move the indoor unit to ensure hooks properly match
with AC-fixing board.
Installation of outdoor unit
1. The wall bearing the outdoor unit has to be solid enough, if
there is platform for outdoor unit, just put the unit on platform.
Drill a hole for expansion bolt on wall according to the
fixing hole of installation frame of AC.
Fix 4 expansion bolts.
Fix the installation frame and fasten the bolts.
Put the outdoor unit on the frame, then fasten the
outdoor unit on the frame properly.
2. Connection of the pipe
Put the taper nut in the center of the pipe, then fasten
it by hand.
Fasten the nut tight with a spanner.
3. Connection of the outdoor unit.