Operating instructions
Table Of Contents
- Protective dispersion Extra RM 782
- Care treatment
- n WARNING
- n WARNING
- n WARNING
- These are only brief instructions! Please read the product information and observe the safety information on the product label prior to using the detergent. Follow the dosing instructions on the product label.
- The non-compliance with the safety information can cause damage to the object to be cleaned and risks for the environment, the user and other persons.
- n WARNING
- 1
- A
- B
- C
- A Deep clean the floor covering, check the pH-value. Nominal value: 7 - 8.5.
- 2
- A
- B
- C
- A Apply the undiluted product (approx. 25- 45 ml/m², depending on the floor covering) to the floor covering. Work in sections of max. 10 m².
- A Apply the undiluted product (approx. 25- 45 ml/m², depending on the floor covering) to the floor covering. Work in sections of max. 10 m².
- A Apply the undiluted product (approx. 25- 45 ml/m², depending on the floor covering) to the floor covering. Work in sections of max. 10 m².
- B Spread the protective dispersion swiftly in thin layers and overlapping paths towards the door.
- C Allow the care film applied to dry completely, do not step on the surface (approx. 30 minutes, depending on the indoor climate).
- D After it has dried completely, apply a second layer. Depending on the floor covering 20 - 30 ml/m².
- A Apply the undiluted product (approx. 25- 45 ml/m², depending on the floor covering) to the floor covering. Work in sections of max. 10 m².
- 3
- A
- B
- A If necessary, set up a drying fan. Drying time without drying fan at least 3 hours.
QUICKSTART
5.965-280.0 04/14
Protective dispersion Extra RM 782
Care treatment
몇 WARNING
These are only brief instructions! Please read the product information and observe the safety information on the
product label prior to using the detergent. Follow the dosing instructions on the product label.
The non-compliance with the safety information can cause damage to the object to be cleaned and risks for the
environment, the user and other persons.
Preparation
1
ABCA Deep clean the floor covering, check the
pH-value. Nominal value: 7 - 8.5.
B Mask surfaces that are not to be treated.
Hold work materials available.
C Carefully tilt the coating prior to use, do not
shake.
Coating
2
A B C A Apply the undiluted product (approx. 25-
45 ml/m², depending on the floor covering)
to the floor covering. Work in sections of max.
10 m².
B Spread the protective dispersion swiftly in
thin layers and overlapping paths towards the
door.
C Allow the care film applied to dry completely,
do not step on the surface (approx. 30 min-
utes, depending on the indoor climate).
D After it has dried completely, apply a second
layer. Depending on the floor covering 20 -
30 ml/m².
Curing
3
AB A If necessary, set up a drying fan. Drying time
without drying fan at least 3 hours.
B Ready to walk on after 3 hours.
Resilient after approx. 24 hours.
Completely cured after approx. 2 weeks.
Note
The drying times depend on the indoor climate.