30'' × 84'' Barn Door Installation Instruction Package List No. Name Side Stile 1 Quantity 2 2 Top Rail 1 3 Middle Rail 1 4 Bottom Rail 1 5 Left Side Slat 2 6 Middle Slat 6 7 Right Side Slat 2 8 Diagonal Plank 2 9 Diagonal Plank 2 A 2-3/4'' Lag Bolts 10 B Wood Plug 10 C 13/16'' Lag Bolts 32 2 8 8 9 9 1 5 6 6 6 7 1 3 5 6 6 6 7 A B 4 C D Step 1. Assemble on clean and flat ground, find the No.1 (side stile) and let the grooved side face to the right, find the No.
Step 2. Find the 2 pcs of No.5 (left side slat) insert into No.1 (left side stile), then insert 6 pcs of No.6 (middle slat) one by one and insert 2 pcs of No.7 (right side slat) to No.6, finally assemble another No.1 (right side stile) Step 3. Insert the 10 pcs of A (2-3/4'' lag bolts) into No. 1 (left side stile and right side stile) and tighten them securely A A 2 A A A 1 1 56 6 6 7 A 3 Step 4. Insert the 10 pcs of B (wood plug) into all holes of No.
You also install this style C C 8 9 9 8 WARNING It is recommended to wear protective equipment during installation and transportation to prevent sprain and bruise. If the door is not securely installed, it may cause the door to move or fall apart unexpectedly. Please make sure all the screws are in place and tighten before hanging. Please note that body parts (such as hair, fingers, etc.) stuck in the moving parts during installation may cause squeezing and serious injury.