User's Manual
Table Of Contents
- 1 About this Document
- 2 General Information
- 3 Preconditions and Requirements
- 4 Installing the C-Hub
- 5 Installing the E-Hub
- 6 Installing the HPRU
- 7 Cabling
- 8 System Documentation
- 9 Glossary
- 10 List of Diagrams
- 11 List of Tables
- Fig. 1: Scope of delivery
- Fig. 2: Example of a handover point for the BTS signals at a c-rail
- Fig. 3: Example of a handover point for the BTS signals with individual loads with short patch cables at a c-rail
- Fig. 4: Clearance Ⓐ above radiation fins of the installed devices
- Fig. 5: Sliding rails Ⓑ
- Fig. 6: Power distribution bar ① mounted on the left-hand traverse
- Fig. 7: Plugs for power connection: ① is for red circuit, ② for black circuit
- Fig. 8: Attaching a 19" mounting bracket
- Fig. 9: Attached sliding rails Ⓑ
- Fig. 10: Place C-hub in rack
- Fig. 11: Fix C-hub with screws
- Fig. 12: Connect power cable at rear side
- Fig. 13: Connect ground cable at rear side
- Fig. 14: Attaching a 19" mounting bracket
- Fig. 15: Marking position of mounting holes
- Fig. 16: Mounting completed
- Fig. 17: Connect power cable at rear side
- Fig. 18: Connect ground cable at rear side
- Fig. 19: Attaching handle
- Fig. 20: Attaching bracket Ⓐ
- Fig. 21: Marking mounting holes for bracket Ⓑ
- Fig. 22: Prepare expansion bolts for bracket Ⓑ
- Fig. 23: Mounting accessories for bracket Ⓑ
- Fig. 24: Bracket Ⓑ mounted
- Fig. 25: Hook HPRU into bracket Ⓑ (①) and fix from top (②).
- Fig. 26: HPRU fixed from top
- Fig. 27: Fix HPRU from side
- Fig. 28: Connect power cable at bottom side
- Fig. 29: Connect ground cable at bottom side
- Fig. 30: Interfaces at the C-hub front side
- Fig. 31: Interfaces at the C-hub rear side
- Fig. 32: Interfaces at the E-hub front side
- Fig. 33: Interfaces at the E-hub rear side
- Fig. 34: Interfaces at the HPRU connector side
- Fig. 35: Fibre optical cable layout
- Fig. 36: Coaxial cable layout
- Fig. 37: Power supply cable layout
- Tab. 1: Symbols and signal words
- Tab. 2: Storage of the system documentation
5 of 50936.5467 0.92
Signal words
Mentions
d’avertis-
sement
Description
Danger Immediate risk of death or serious physical injury
Risque immédiat de mort ou blessures corporelles graves
Warning
Avertis-
sement
Possible risk of death or serious physical injury
Risque potentiel de mort ou blessures corporelles graves
Caution
Prudence
Possible risk of slight or moderately severe physical injury
Risque potentiel de blessures corporelles légères ou moyennement
graves
Notice
Attention
Potential damage to property
Risque de dommages matériels
Tip
Avis
Instruction for operation or use of the instructions
Instructions d’emploi ou d’utilisation des instructions
Tab. 1: Symbols and signal words
1.4 Target Audience
These instructions are targeted at persons who
● are familiar with the applicable terms and skills when installing and operating electrical
systems for telecommunications (mobile telephony and data distribution systems).
● because of their technical training, knowledge and experience, together with the
knowledge of the applicable regulations are able to assess the following work and
recognise potential hazards:
– Installation of devices for transmission of messages and data
– Making up and connecting data transmission cables (LAN)
– Making up and connecting power supply cables
– Laying and connecting optical cables ( bre optic cables)
1.5 Scope of the Document
Tip
This document describes the K-BOW platform2, only. The K-BOW platform1 is
described in separate documents.
This document describes the installation of the K-BOW hubs, beginning from the
BTS handover point
1)
to the E-hub . It describes the general requirements to the installation
location, techniques for laying cables and refers to the applicable documents.
1)
The BTS handover point is the point after the remote radio head or power amplier of the BTS
in which the BTS signal is tapped for the K-BOW system.