User's Manual
Table Of Contents
- 1 About this Document
- 2 General Information
- 3 Preconditions and Requirements
- 4 Installing the C-Hub
- 5 Installing the E-Hub
- 6 Installing the HPRU
- 7 Cabling
- 8 System Documentation
- 9 Glossary
- 10 List of Diagrams
- 11 List of Tables
- Fig. 1: Scope of delivery
- Fig. 2: Example of a handover point for the BTS signals at a c-rail
- Fig. 3: Example of a handover point for the BTS signals with individual loads with short patch cables at a c-rail
- Fig. 4: Clearance Ⓐ above radiation fins of the installed devices
- Fig. 5: Sliding rails Ⓑ
- Fig. 6: Power distribution bar ① mounted on the left-hand traverse
- Fig. 7: Plugs for power connection: ① is for red circuit, ② for black circuit
- Fig. 8: Attaching a 19" mounting bracket
- Fig. 9: Attached sliding rails Ⓑ
- Fig. 10: Place C-hub in rack
- Fig. 11: Fix C-hub with screws
- Fig. 12: Connect power cable at rear side
- Fig. 13: Connect ground cable at rear side
- Fig. 14: Attaching a 19" mounting bracket
- Fig. 15: Marking position of mounting holes
- Fig. 16: Mounting completed
- Fig. 17: Connect power cable at rear side
- Fig. 18: Connect ground cable at rear side
- Fig. 19: Attaching handle
- Fig. 20: Attaching bracket Ⓐ
- Fig. 21: Marking mounting holes for bracket Ⓑ
- Fig. 22: Prepare expansion bolts for bracket Ⓑ
- Fig. 23: Mounting accessories for bracket Ⓑ
- Fig. 24: Bracket Ⓑ mounted
- Fig. 25: Hook HPRU into bracket Ⓑ (①) and fix from top (②).
- Fig. 26: HPRU fixed from top
- Fig. 27: Fix HPRU from side
- Fig. 28: Connect power cable at bottom side
- Fig. 29: Connect ground cable at bottom side
- Fig. 30: Interfaces at the C-hub front side
- Fig. 31: Interfaces at the C-hub rear side
- Fig. 32: Interfaces at the E-hub front side
- Fig. 33: Interfaces at the E-hub rear side
- Fig. 34: Interfaces at the HPRU connector side
- Fig. 35: Fibre optical cable layout
- Fig. 36: Coaxial cable layout
- Fig. 37: Power supply cable layout
- Tab. 1: Symbols and signal words
- Tab. 2: Storage of the system documentation
18 of 50
Preconditions and Requirements
936.5467 0.92
3 Preconditions and Requirements
3.1 Preconditions for Installation
Before starting the installation,
● check the delivery for completeness; cf. 2.9, p. 16 .
● contact the project manager and make sure that all planning documents necessary for
installation are nalised and available on site.
1)
● all points on the checklist Ready for Installation must have been satised. The template
for this checklist is provided by Kathrein during the installation training.
● the handover point for the BTS signals must have been specied and be available;
examples are shown in Fig. 2 and Fig. 3. This installation manual describes the instal-
lation of the system from this handover point to the E-hub.
The following information must be available to the installer when starting the installation:
● Detailed location address
● Phone number, email and address of:
– Customer’s contact person
– Facility manager of the building
– Site manager
– Installation company's site manager
– Responsible Kathrein project manager
– Contact person at the mobile network provider
● The following documents must be available:
– Cabling plan
– Installation plan
1)
Amongst others, the following items must be veried: signal intensity, signal quality, required
coverage range, device location, antenna-feeder system and power supply system.
Fig. 2: Example of a handover point for the
BTS signals at a c-rail
Fig. 3: Example of a handover point for the BTS signals with
individual loads with short patch cables at a c-rail