Preconditions and Requirements
936.5467 0.92
3 Preconditions and Requirements
3.1 Preconditions for Installation
Before starting the installation,
check the delivery for completeness; cf. 2.9, p. 16 .
contact the project manager and make sure that all planning documents necessary for
installation are nalised and available on site.
1)
all points on the checklist Ready for Installation must have been satised. The template
for this checklist is provided by Kathrein during the installation training.
the handover point for the BTS signals must have been specied and be available;
examples are shown in Fig. 2 and Fig. 3. This installation manual describes the instal-
lation of the system from this handover point to the E-hub.
The following information must be available to the installer when starting the installation:
Detailed location address
Phone number, email and address of:
Customer’s contact person
Facility manager of the building
Site manager
Installation company's site manager
Responsible Kathrein project manager
Contact person at the mobile network provider
The following documents must be available:
Cabling plan
Installation plan
1)
Amongst others, the following items must be veried: signal intensity, signal quality, required
coverage range, device location, antenna-feeder system and power supply system.
Fig. 2: Example of a handover point for the
BTS signals at a c-rail
Fig. 3: Example of a handover point for the BTS signals with
individual loads with short patch cables at a c-rail