User's Manual

Table Of Contents
41 of 50936.5467 0.92
7.2.3 Cabling the Coaxial Connections
The coaxial cables for connecting the BTS and the C-hub (via the load unit) are provided.
Install the required coaxial connections. Fig. 36 gives an overview.
BTS
Control Bus in/out 48 V
BS Rx/Tx
Rx/Tx
Port 2
BS Rx/Tx
Rx/Tx
Port 1
BS Rx/Tx
Rx/Tx
Port 6
BS Rx/Tx
Rx/Tx
Port 5
BS Rx/Tx
Rx/Tx
Port 4
BS Rx/Tx
Rx/Tx
Port 3
Load
unit
Control Bus in/out
48 V 48 V 48 V 48 V 48 V 48 V 48 V 48 V 48 V 48 V 48 V 48 V 48 V 48 V
Power
distribution
unit
Power
1234
C-hub
(Master)
SLAVE DEBUG GE
CH1CH2
Power
MASTER
RU2
OPS OPM RUN
SLAVE DEBUG GE
CH1CH2
Power
MASTER
RU1
OPS OPM RUN
*
)
*
)
*
)
*
)
*
)
*
)
*
)
*
)
*
)
*
)
4.3–10 connectors
*
)
*
)
*
)
*
)
*
)
Remote
units
Combiner
Antennas
Splitter/
Tapper
Fig. 36: Coaxial cable layout