User's Manual
Table Of Contents
- 1 About this Document
- 2 General Information
- 3 Preconditions and Requirements
- 4 Installing the C-Hub
- 5 Installing the E-Hub
- 6 Installing the HPRU
- 7 Cabling
- 8 System Documentation
- 9 Glossary
- 10 List of Diagrams
- 11 List of Tables
- Fig. 1: Scope of delivery
- Fig. 2: Example of a handover point for the BTS signals at a c-rail
- Fig. 3: Example of a handover point for the BTS signals with individual loads with short patch cables at a c-rail
- Fig. 4: Clearance Ⓐ above radiation fins of the installed devices
- Fig. 5: Sliding rails Ⓑ
- Fig. 6: Power distribution bar ① mounted on the left-hand traverse
- Fig. 7: Plugs for power connection: ① is for red circuit, ② for black circuit
- Fig. 8: Attaching a 19" mounting bracket
- Fig. 9: Attached sliding rails Ⓑ
- Fig. 10: Place C-hub in rack
- Fig. 11: Fix C-hub with screws
- Fig. 12: Connect power cable at rear side
- Fig. 13: Connect ground cable at rear side
- Fig. 14: Attaching a 19" mounting bracket
- Fig. 15: Marking position of mounting holes
- Fig. 16: Mounting completed
- Fig. 17: Connect power cable at rear side
- Fig. 18: Connect ground cable at rear side
- Fig. 19: Attaching handle
- Fig. 20: Attaching bracket Ⓐ
- Fig. 21: Marking mounting holes for bracket Ⓑ
- Fig. 22: Prepare expansion bolts for bracket Ⓑ
- Fig. 23: Mounting accessories for bracket Ⓑ
- Fig. 24: Bracket Ⓑ mounted
- Fig. 25: Hook HPRU into bracket Ⓑ (①) and fix from top (②).
- Fig. 26: HPRU fixed from top
- Fig. 27: Fix HPRU from side
- Fig. 28: Connect power cable at bottom side
- Fig. 29: Connect ground cable at bottom side
- Fig. 30: Interfaces at the C-hub front side
- Fig. 31: Interfaces at the C-hub rear side
- Fig. 32: Interfaces at the E-hub front side
- Fig. 33: Interfaces at the E-hub rear side
- Fig. 34: Interfaces at the HPRU connector side
- Fig. 35: Fibre optical cable layout
- Fig. 36: Coaxial cable layout
- Fig. 37: Power supply cable layout
- Tab. 1: Symbols and signal words
- Tab. 2: Storage of the system documentation
56 of 64
Structure of the Web GUI
936.5468 0.92
8.4.12 Capacity Management > Service Configuration
Parameter Description
Type
Capacity allocation switch
Capacity allocation switch W
Master C-hub carrier configuration information
CH x CB0–CB1 (BW/UL/DL) R
Slave C-hub 1 carrier configuration information
CH x CB0–CB1 (BW/UL/DL) See Master C-hub carrier conguration information –
Slave C-hub 2 carrier configuration information
CH x CB0–CB1 (BW/UL/DL) See Master C-hub carrier conguration information –
HPRU channel information
CH x info (UL/DL) R
Group 1 channel mapping information
CH x R
Group 2 ... 3 channel mapping
information
See Group 1 channel mapping information
RF channel mapping information
Capacity group W
HPRU CH x
W
Update
B
Tab. 28: Service conguration parameters HPRU
8.4.13 Capacity Management > Service Switch
Parameter Description
Type
Sunday
Working hours starting–ending (24 h) W
Service group (working hours) W
Service group (non-working hours) W
Monday ... Saturday See Sunday
Tab. 29: Service switch parameters HPRU