Technical data

b) Mounting the support arm (Fig. 5)
Mount the azimuth/elevation support arm ZAS 120 on
the mast as shown in the drawing.
Refer to the operating instructions supplied with the
ZAS 120 for more information regarding installation.
If you do not intend to mount the antenna on the top
of the mast, you must first remove the support angle
W from the support arm.
936.2079/A/0206/4.8e
c) Preparing the antenna (Fig. 6)
1. Remove the four screws from the protective strip of
wood.
For the following mounting steps, do not remove the
carton yet. It protects the feed system support.
Swing out the arm until it lies on the edge of the
carton.
2. Lift up the parabolic antenna. The arm continues to
swing out until it is fixed in the lock V.
3. Tighten the four screws S (SW 19).
Tightening torque 37-43 Nm.
4. Connect the prepared antenna to the support
ZAS 120.
Fig. 5
Fig. 6
V
S
W
Installation on top of mast Installation in front of mast
Remove