Operation Manual

5
SET UP
INITIAL SET UP
Before operating the device for the rst time remove the T 8.0 A fuse from the packaging and place it
in the fuse holder on the rear of the device.
The removal of this fuse prevents the device switching on unintentionally during transport.
Important!
Please remove this fuse again on renewed shipping of the device!
Now remove the AC power unit (100V...250V) supplied from the packaging and connect it to the device
and mains. The integrated lithium-ion rechargeable battery and the green light emitting diode indicate
the external supply of power. You can check the charge state of the rechargeable battery by pressing
the “Test” button.
SETTING UP THE DEVICE
When setting up the device pay attention to adequate ventilation of the device!
To avoid a build up of heat, the openings for the fan and the ventilation holes must always be clear.
Set up the device as shown in the gure.
Note!
See also “Charge state indication” and “DC supply socket” in the chapter “Interfaces”!
OPTIONS FOR SETTING UP
After tting the fuse, the device must be operated/charged for approx. two hours on the mains. Then the
device must be operated on the battery and the battery fully discharged at least once (until the device
switches itself off). Only after complete charging and subsequent discharging of the device can the battery
charge state indication be correctly displayed by the device.