User manual
Installation
17/48
4.1 Installationrequirements
● Beforebeginningtheinstallation,theinstallationguidelinesmustbeobserved.
● Contactpersononsite(foraccesstothemainsdisconnectorintheelectricaldistributionpanelboard).
● Theelectricalconnection(powersupplyline)mustbeprepared.
● Acclimatization
Foratemperaturedifferenceofmorethan15°Cbetweentransportandinstallationsite,thechargingsta
tionshouldbeallowedtoacclimateunopenedforatleasttwohours.
Openingthechargingstationimmediatelycancausewatertoforminsideandleadtodamagewhenthe
deviceisswitchedon.Undercertaincircumstances,thisdamagemaynotoccuruntilalaterpointafter
theinstallation.
Intheidealcase,thechargingstationshouldbestoredattheinstallationsideforseveralhourspriorto
installing.Ifthisisnotpossible,thechargingstationshouldnotbestoredoutsidewithcoldtemperatures
(<5°C)overnightorstoredinavehicle.
ToollistforKCP20
Thefollowingtoolsarerequiredfortheinstallation:
● Flatheadscrewdriverforsupplyterminals(bladewidth5.5mm)
● FlatheadscrewdriverforterminalsX1/X2(bladewidth3.0mm)
● PhillipsheadscrewdriverPH2
● MountingtoolsforcablescrewconnectionsM16(widthacrossflats20mm)andM32(widthacrossflats
36mm)
● LSA+insertiontool(optional)