User manual
Installation
26/48
4.5.2 Connectingthepowersupplyline
Runningthepowersupplyline(surfacecablerout
ing)…
RunthesupplylinefromABOVEasshowninthe
figure.
[M]…Cablesheathing
Runningthepowersupplyline(flushtypecable
routing)…
Thepowersupplycablemustberunasshown
throughthefeedthrough/doublemembraneseal
[DMS].
Makesurethatthedoublemembranesealfits
cleanlyagainstthecablesheathing.
Pleaseobserve:
● Useofasuitablecablesheathingdiameterofthesupplylineorincreaseofthecablesheathingdiameter
bymeansofsuitablesealadapter(seelist"Scopeofsupply"fordetailsabouttheterminalrange).
● Feedthesupplyline(feedlinefromabove)resp.doublemembraneseals(feedlinefrombehind)suffi
cientlyintothecablegland.Thecablesheathingmustbevisibleintheconnectionarea.
● Theinstallationpipeorcableconduitwiththefeedlinemaynotbescrewedtogetherinthecablegland
(feedlinefromabove)orrunthroughthedoublemembraneseals(feedlinefrombehind).
● Thefeedlinemustberunstraightthroughthecablegland(feedlinefromabove)resp.thedoublemem
braneseals(feedlinefrombehind),incompliancewiththebendingradii(approx.cablediametertimes
10).
● Thecableglandresp.doublemembranesealsmustbeinstalledproperlyandscrewedtogethersuffi
ciently.