Connectingthepowersupplyline…
Shortentheconnectionwirestotheappropriate
length;theseshouldbekeptasshortaspossible.
ThePEconductormustbelongerthantheremain
ingconductors!
Stripapprox.12mmfromtheconnectionwires.
Coreendsleevesarerecommendedforfine
strandedwires.
Performtheconnectionofthepowersupplyline
[L1],[L2],[L3],[N]and[PE].
Observewhichphaseconductoryouconnecttoter
minal[L1]ifseveralchargingstationsareinstalled
inanetwork(DIPswitchsettingsforloadmanage
ment).
1phaseconnection…
Itisalsopossibletoconnectthechargingstationwith
only1phase;theterminals[L1],[N]and[PE]aretobe
usedforthis.
Supplyterminals…
Thesupplyterminalsaredesignedasspringtypeter
minals.
Inserttheflatheadscrewdriver(5.5mm)intothe
powersupplyterminalasshowninthefigure.
Terminaldata:
Fixed(min.max):0.2–16mm²
Flexible(min.max):0.2–16mm²
AWG(min.max):24–6
Flexible(min.max)withwireendsleeve:
Without/withplasticsleeve
0.25–10/0.25–10mm²
Insulationstrippinglength:12mm
Flatheadscrewdriver5.5mm
ATTENTION
Riskofbreakingtheterminal!
Donotpressthescrewdriverup,downortotheside!