COMMISSIONING MODE (DSW2.8)
Function
DIP-switch
Figure
Commissioning mode
activate
D2.8
ON=yes
Set D2.1 to D2.7 to OFF!
4.6 Commissioning
General commissioning process
1. Remove all residual installation and connection materials from the connection area.
2. Before commissioning, check all screw and terminal connections for firm seating!
3. Check whether all unused cable glands are properly sealed with blind plugs or dummy screw
fittings.
4. Ensure that the voltage of the mains supply line is switched on.
After 15 to 20 seconds, the status LED must flash green slowly.
The device performs a self test every time it is switched on.
5. Perform the specified initial tests according to the locally applicable regulations and laws (see
the "Commissioning mode/self test" chapter).
6. Close the connector panel cover to the charging station.
7. Mount the housing cover (see the " Mounting the housing cover" chapter).