User manual

Installation
22 / 48
Marking the holes
Marking the holes
Mark the four holes [1] to [4] using the
supplied drilling template and a spirit
level.
Drill the four mounting holes.
Information about the drilling template:
The drilling template shows the outer contour of
the charging station.
The four main mounting holes are aligned cen-
tered to the slotted holes on the device.
The three holes in the upper right show the area
for the cable insertions and help to be able to
align the mounting position of the device to the
cables.
The two notches on the top side are used for
aligning the device to the connection lines.
In the lower part, the holes for the optional cable
hanger can be drilled appropriate to the device.
This part can be separated if the cable hanger is
not mounted or is to be mounted at a different
location.
Water drainage
Water drainage
The water drainage from the top side to the rear
side of the charging station must be ensured.
Therefore, observe the following:
Only a vertical installation of the charging
station is permitted.
The charging station must be mounted at an
angle of 90° (no inclination is permitted!).