User manual

Installation
34 / 48
PHASES / ONLY FOR LOAD MANAGEMENT MODE
DSW1.3 to DSW1.5
Function
DIP-switch
Figure
Supply (phases)
D1.3
ON=
only 1
phase
OFF= all
3
Phases
Phase assignment (*)
D1.4
D1.5
Figure
Phase L1 at terminal 1
connected
OFF
OFF
ON
OFF
Phase L2 at terminal 1
connected
OFF
ON
Phase L3 at terminal 1
connected
ON
ON
(*) Comments:
For load distribution, with 1-phase operating mode, any phase (L1, L2 or L3) of the mains supply line can be
connected to the connection terminal 1.
The determination of which phase of the mains supply line was connected serves for informing the (optional)
load management software in order to facilitate an efficient and proper load distribution.