User manual

Further technical instructions
42 / 48
5.2 Configure the communication with the EV PLC->Ethernet (optional)
To allow the access of the vehicle to the home network or internet, the power line communication
between vehicle and charging station must be configured on both sides with the same password
(NMK „Network Membership Key“).
The default password is „emobility“. It is recommended to change this password.
The required software ("EV Communication Assistant“) including the instructions how to configure
the charging station, you can find in the download area under www.kecontact.com.
Further details how to configure your vehicle, please see the manufacturer’s manual of your vehi-
cle.
5.3 Replacing the fuse
The following fuse must be used:
Description
Current / Voltage
Type
Dimensions
F1
3.15 A / 250 V
Slow-blow with high breaking
capacity (>1500A) (T) (H)
5 x 20 mm fuse
Opening the fuse holder
Replacing the fuse
Switch off the mains supply line of the
charging station completely.
Remove the connector panel cover.
Press a flathead screwdriver into the
opening of the fuse holder.
Turn the fuse holder counterclockwise
until the spring pushes out automatically.
Replace the fuse.
Push the fuse holder in and retighten in
the clockwise direction.