User manual

Installation
16/44
4.1 Installation requirements
Before beginning the installation, the installation guidelines must be observed.
Contact person on-site (for access to the mains disconnector in the electrical distribution panel board).
The electrical connection (power supply line) must be prepared.
Acclimatization:
For a temperature difference of more than 15°C between transport and installation site, the charging sta-
tion should be allowed to acclimatize unopened for at least two hours.
Opening the charging station immediately can cause water to form inside and lead to damage when the
device is switched on. Under certain circumstances, this damage may not occur until a later point after
the installation.
Ideally, the charging station should be stored at the installation side for several hours prior to installation.
If this is not possible, the charging station should not be stored outside overnight or stored in a vehicle at
cold temperatures (< 5°C).
Tool list
The following tools are required for the installation:
Flathead screwdriver for supply terminals (blade width 5.5 mm)
Flathead screwdriver for terminals X1/X2 (blade width 3.0 mm)
Phillips head screwdriver PH2
Mounting tools for cable screw connections M16 (width across flats 20 mm) and M32 (width across flats
36 mm)
LSA+ insertion tool (optional)