User guide
KENCO ENGINEERING COMPANY 
P.O. BOX 470426, TULSA, OK 74147-0426 
PHONE: (918) 663-4406  FAX: (918) 663-4480 
http://www.kenco-eng.com e-mail: info@kenco-eng.com 
INSTALLATION AND OPERATING INSTRUCTIONS 
FOR MODEL ESP AND ST 
1.  INSTALL GAUGE ON TANK FLANGES, MAKING SURE TUBE HOLDERS 
ARE NOT REMOVED OR ALLOWED TO SLIP DOWN DURING 
INSTALLATION. BOLT GAUGE FLANGES TO MATCHING FLANGES 
WITH CORRECT SIZE BOLTS FOR FLANGE SIZE USED. TIGHTEN 
BOLTS ACCORDING TO THE FOLLOWING BOLT TORQUES: 
FLANGE SIZE      TORQUE 
1”-150#        15 FT- LBS. 
1 1/2” – 150#        20 FT-LBS 
2”-150#  25 FT-LBS. 
3”-150#  40 FT-LBS. 
4”-150#  45 FT-LBS. 
2.  THE GAUGE SHOULD BE INSTALLED WITH VALVES. ONCE 
INSTALLED, VALVES MUST BE OPENED SLOWLY SO THAT 
TEMPERATURE AND PRESSURE CHANGES DO NOT BREAK THE 
GLASS. 
3.  TO CLEAN GAUGE GLASS, CLOSE VALVES AND OPEN DRAIN PLUGS 
TO DRAIN EXCESS FLUID OFF.  REMOVE ALL BUT ONE OF THE 
FLANGE BOLTS. LOOSEN THIS FLANGE BOLT AND ROTATE GAUGE 
SO THAT THE GLASS MAY BE CLEANED OR REPLACED. 


