Gas connection
All connections must be wrench-tightened
Flare
Union
Flare
Union
GAS FLOW
Manual
Shuto
Valve
Closed
Open
Flexible
Connector
Inlet Pipe on
Back of Dryer
elppiN
Shuto Valve -
Open position
to dryer
from gas supply
1 Remove the shipping cap from gas pipe at the rear
of the dryer.
4 Check for gas system leaks with a manometer. If a
manometer is not available, test all connections by
brushing on a soapy water solution.
3 Open the shuto valve in the gas supply line to
allow gas to ow through the pipe. Wait a few
minutes for gas to move through the gas line.
2 Connect a 1/2 inch (1.27 cm) I.D. semi-rigid or
approved pipe from gas supply line to the 3/8 inch
(0.96 cm) pipe located on the back of the dryer. Use
a 1/2 inch to 3/8 inch (1.27 cm to 0.96 cm) reducer
for the connection. Apply an approved thread sealer
that is resistant to the corrosive action of lique ed
gases on all pipe connections.
WARNING
EXPLOSION HAZARD
NEVER test for gas leaks with an open ame.
IMPORTANT
The supply line must be equipped with an approved
manual shuto valve. This valve should be located in the
same room as the dryer and should be in a location that
allows ease of opening and closing. Do not block access
to the gas shuto valve.
IMPORTANT
DO NOT connect the dryer to L.P. gas service without
converting the gas valve. An L.P. conversion kit must be
installed by a quali ed gas technician.