Installation guide
HSITSNa 
STEP 
4: 
PREPARE 
THE 
WALL 
AND 
UPPER 
CABINET 
FOR 
INSTALLATION 
DRILL 
THE 
HOLES 
IN 
THE 
WALL 
AND 
UPPER 
CABINET. 
A 
WARNING 
A 
BE 
VERY 
CAREFUL 
WHEN 
DRILLING 
HOLES 
INTO 
THE 
WALL. 
Electrical 
wires 
could 
be 
concealed 
behind 
the 
wall 
covering 
and 
if 
the 
drill 
hits 
them 
you 
could 
get  an 
electric 
shock. 
as 
——— 
4 
WARNING 
& 
—— 
. 
Find 
the 
points 
on 
the 
mounting 
plate 
labeled 
"A",  "B", 
"C" 
and 
"D". 
Drill 
a 
3/16" 
diameter 
hole 
at 
any 
of 
these 
points 
that 
are 
in 
front 
of 
a 
wall 
stud. 
Drill 
a 
3/4" 
diameter 
hole 
at 
any 
of 
these 
points 
that 
are 
over 
drywall. 
. 
Drill 
a 
3/8" 
hole 
at 
points 
"J" 
and 
"K" 
on 
the 
upper 
cabinet 
template. 
NOTE: 
If 
the 
bottom 
of 
the 
upper 
cabinet 
is 
recessed 
3/4" 
or 
more, 
you 
will 
need 
2"x2" 
filler 
blocks 
(not 
included) 
to 
provide 
additional 
support 
for 
the 
bolts. 
See 
Figure 
24. 
* 
Mark 
the 
center 
of 
each 
filler 
block 
and 
drill  a 
3/8" 
diameter 
hole 
at 
the 
mark. 
* 
Align 
filler 
blocks 
over 
the 
two 
openings 
in 
the 
top 
of 
the 
microwave 
oven 
cabinet 
and 
attach 
to 
cabinet 
with 
masking 
tape. 
See 
Figure 
25. 
. 
Cut 
or 
drill  a 
2" 
diameter 
hole 
at 
the 
area 
marked 
"M", 
"power 
supply 
cord 
hole” 
on 
the 
upper 
cabinet 
template. 
If 
the 
upper 
cabinet 
is 
metal, 
you 
will 
need 
to 
cover 
the 
edge 
of 
the 
hole 
with 
the 
power 
supply 
cord 
bushing 
(supplied) 
to 
prevent 
damage 
to 
the 
cord 
from 
the 
rough 
metal 
edge. 
filler 
block 
cabinet 
bottom 
shelf 
cabinet 
front 
YOU 
MUST 
COVER 
THE 
EDGE 
OF 
THE 
POWER 
SUPPLY 
CORD 
HOLE 
IN 
A 
METAL 
CABINET 
WITH 
THE 
POWER 
SUPPLY 
CORD 
BUSHING. 
FAILURE 
TO 
DO 
SO 
COULD 
RESULT 
IN 
DAMAGE 
TO 
THE 
CORD 
AND 
ELECTRIC 
SHOCK. 
Figure 
24 
. 
Cut 
out  the 
venting 
areas 
(with 
the 
saber 
saw): 
* 
Roof 
Venting: 
cut 
out 
the 
shaded 
area 
marked 
"L" 
on 
the 
upper 
cabinet 
template. 
_) 
C3) 
« 
Wall 
or 
Room 
Venting 
(Recirculating): 
go 
to 
STEP 
filler 
5, 
INSTALL 
THE 
MOUNTING 
PLATE, 
located 
on 
: 
block 
page 
15. 
Ae 
. 
Use 
caulking 
compound 
to 
seal 
the 
exterior 
wall 
or 
roof 
opening 
around 
the 
wall 
cap 
or 
roof 
cap. 
Figure 
25 
14 










