Installation guide

PARTS,
TOOLS,
MATERIALS
YOU
WILL
NEED
THE
FOLLOWING
TOOLS
AND
MATERIALS
FOR
THE
INSTALLATION:
Carton
or
other
heavy
material
for
covering
the
counter
top.
HSITDSNaAa
Clear
Tape
(for
taping
the
templates
to
the
wall)
RED
Stud
Finder
or
Thin
Nail
Ss
Saber
Saw
(for
cutting
vent
holes
for
roof
or
wall
vending)
Phillips
Screwdriver
(for
the
screws)
Keyhole
Saw
(for
the
power
cord
hole)
——
et)
3/8"
and
3/4"
wood
drill
bits
<7"
Pencil
1/2"
and
3/16"
memecance
drill
bits
<a
—SS
Flat
Blade
Screwdriver
(for
the
bolts)
Plumb
Line
a
BS
ES
Measuring
Tape
(metal
preferred)
Duct
Tape
tr
=
y
@)
Small
Side
Cutters
or
Tin
Snips
Caulking
gun
Co
e
If
you
have
brick
or
masonry
walls,
you
need
special
hardware
and
tools.
e
The
ductwork
you
need
for
the
installation
is
not
included.
All
wall
and
roof
caps
must have
a
back-draft
damper.
6