Installation Guide
Installing Your Water Optimizer
Installing Your Water Optimizer 2-43
Connecting Water Optimizer
Congratulations! You are now close enough to the end that you should be able to taste it.
This is the second easiest of the nal stages.
You should either have one or two water lines that end in
C
1/4 in. Quick Connect Shuto Valve(s) running to where you plan on locating your
new Water Optimizer. The rst (or only) should be from your Water Source or
E
1/4 in. Brass Compression Tee (for Parallel Conguration). We will refer to this line as
your Source Line. The second (if applicable) should be from your Accessory Appliance, or
1/4 in. Brass Compression Tee if you have 2 Accessory Appliances. We will refer to this
as your Accessory Line.
1. Move your new Water Optimizer to its nal location. Do not plug the power cord in yet.
2. Cut nal short section(s) of tubing from 1/4 in. White PP Tubing to run from the
C
1/4 in. Quick Connect Shuto Valve(s) to your Water Optimizer’s ports. Be
sure to include enough additional length to allow you to pull your Optimizer away from
the wall (for maintenance).
3. Now connect the section(s) of
A
1/4 in. White PP Tubing to the open port(s) on
the
C
1/4 in. Quick Connect Shuto Valve(s) of your Source Line and
Accessory Line (if applicable). Use the standard quick connect method to attach them.
Diagram 2.7.3 Connect Tubing To Shuto Valve
A










