IN Homeroom ALL®TOGHTHERBETTER USE AND CARE GUIDE ‘WOBBLE 6 LIGHT Questions, problems, missing parts? Before returning to the store, call Kenyon Home Customer Service 8 a.m.-6 p.m., EST, Monday-Friday 904-642-4340 THANK YOU We appreciate the trust and confidence you have placed in Kenyon Home through the purchase of this chandelier. We strive to continually create quality products designed to enhance your home.
Table of Contents Safety Information... won b GMa Rh wow Safety Information o Cousin « Qui 4 lotion with any IMPORTANT: Inspect the wire insulation for electrical questions you may have. any cuts, abrasions, or exposed copper that may have occurred during shipping. If there is 8 deficit in the wire, do mot contain the assembly ‘process, Please call our Customer Service Team at 904-642-4340.
Pr-Installation PLANNING INSTALLATION Read all instructions before assembly. To avoid damaging this product, assemble it on a soft, non-abrasive surface such as carpet or cardboard. Inspect each part for daffodils that may have occurred during shipping. Keep your receipt and these instructions for proof of purchase. NOTE: This item requires the uss of six 120V, 60Hz, 60-Watt max, candelabra base typo B. bulbs (uot included). Do not exceed the Recommended wattage.
Pr-Installation (continued) PACKAGE CONTENTS Pat | Description Quantity A | Pole assembly 1 B | Total frame 1 C | Finial 6 D | Fixture body 1
Assembly instructions 1 Assembling the fixture body 0 Carefully unpack tho fixture, lay out all parts on clean surface. 0 The arms have been turned to lay flat for shipping, turn the arms carefully so that they aw evenly spaced apart. 0 Sower the pole assembly (A) to top of the fixture body (D). 0 Slide the metal frame (B) over the fixture body (D) md secure the metal frame (B) to the fixture body (D) with six finials (C).
Installation instructions 1 Installing the cross bar CAUTION: Ensure the power is off at the ‘main fos bor pro to beginning installation, Tum off the switch at the wall. Turn the power off st the main fuse box. a Install the cross bar (BB) with pimple (FF), Sock mut (DD) to the outlet box using two outlet box screws (CC). o Unscrew the screw collar mut (IT) from the screw collar loop (DELHI. 0 Slide the screw collar mut (II) and then the canopy (GG) onto the end of the chain (17).
Installation instructions (continued) 3 Hanging the light fixture 0 Push all excess wires into the outlet box. ft 0 Raise the canopy (GG) to the ceiling and secure in place by screwing the sower collar ut (IT) onto the screw collar loop (DELHI. 0 Prior to installing the bulbs, please inspect sockets for silica packet, if packet is present, remove and throw away. do not expose to children and pets.
NS Homeroom ALLeTOGHTHER®BETTER www.kenroyhome.