Operation Manual

26
INSTALLATION “A” BETWEEN EXISTING
SIDE CABINETS (560 or 600 mm GAP)
(gs.7.1a,7.1b,7.2a,7.2c)
Mount the 2 (two) metal supports “B
(supplied with the appliance in a separate kit)
as indicated in Figs. 7.1b or 7.2c.
Fig. 7.2c only - prepare 2 wood uprights “A
(width 20-50 mm, thickness 18 mm, length
650 mm); mount the 2 wood uprights “A” to
the cabinet walls as indicated in gure.
Build in the double oven making it slide on the
metal supports “B”.
INSTALLATION “B” BETWEEN SIDE CABINETS BY REMOVING
PROVIOUS HOUSING(gs.7.2b,7.2c)
Remove previous housing.
Mount the 2 (two) metal supports “B” (supplied with the appliance in a separate kit) as
indicated in Fig. 7.2c.
Prepare 2 wood uprights “A” (width 20-50 mm, thickness 18 mm, length 650 mm);
mount the 2 wood uprights “A” to the cabinet walls as indicated in gure.
Build in the double oven making it slide on the metal supports “B”.
544
20
538
718
595
42
560
B
720 min (*)
570 min
B
INSTALLATION “A”
(*) Measure calculated from the underneath
of the worktop to the top support base of
the “B” supports.
Support base
WARNING !
VERY IMPORTANT
The underside of
the cabinet shall
be opened to
allow correct air
circulation.
Fig. 7.1a
560 mm Gap
Fig. 7.1b