Manual

3-6 ATE-DMG 042314
FIGURE 3-4. LOAD CONNECTION, METHOD II USING REMOTE ERROR SENSING.
3.2.4 LOAD CONNECTION, METHOD III
This method is suitable if step changes in the load are expected if, for example, the load is rap-
idly changing in value and maximum dynamic performance is expected directly at the load ter-
minals. In these cases, the output capacitor is disconnected at the power supply and brought
with a heavy, twisted-wire pair directly to the remote load (refer to Figure 3-5).
FIGURE 3-5. LOAD CONNECTION, METHOD III