Installation Manual

Users Instructions For C90
and C110 Models
The Gas Safety (Installation And Use) Regulations: 1996 (as amended) impose certain statutory
obligations on gas users. Further information regarding these regulations can be obtained from your
Gas Supplier.
All gas appliances must be installed by competent persons by law in accordance with these
regulations. Membership of CORGI is indication of such a competent person with regard to gas
installation.
It is in your interests, and that of safety, to ensure that the appliance is installed correctly and that the
law is complied with. Failure to do so could lead to a hazardous &/or potentially dangerous situation.
Introduction
These instructions should be carefully read to ensure safe and economical
use of your boiler.
The Keston C90 and C110 are high efficiency central heating condensing
boilers designed to provide central heating and indirect sanitary hot water
supply. They are designed for use with fully pumped systems only. The C90
and C110 models are supplied for natural gas use only.
Servicing
To ensure continual safe and efficient operation of the boiler it is
recommended that the appliance be checked and serviced as necessary at
regular intervals. Generally once per year will be sufficient. It is the law that
any servicing must be carried out by a competent person.
NB: There are no user serviceable parts inside the boiler cabinet. The
cabinet should only be removed by a qualified competent person.
Clearances
If fixtures are to positioned close to the boiler the following minimum
clearances must be observed: Top : 350 mm, Bottom : 150 mm, Left : 25 mm,
WD356/0/2003
page i

Summary of content (4 pages)