User Instructions

Read Installation Manual Carefully
Ensure that there is at least 9 feet head of water pressure at the
top of the boiler.
Ensure that the boiler(s) is connected to the system via a low
loss balance header.
DO NOT remove the dust caps from the air and exhaust pipes
until ready to connect.
Ensure that ALL dust particles, filings , plastic chips etc. are
removed from the inlet pipe.
If the installation is a replacement the system must be flushed
clean. System should be drained hot, then refilled, then drained
again until the water is clean.
Ensure that there is a proper electrical supply ie 230V fused at
13A for the permanent live.
Ensure that the external controls are configured to form a link
between terminals 17 & 18 to enable boiler.
Take great care with pipe connections to ensure that no
damage is done to the internal pipework.
Ensure that the 22mm condensate pipe is not exposed to
freezing conditions.
Make sure that the exhaust pipe terminates away from windows
or vents and is out of reach.
Make sure that the air inlet and exhaust pipe outlets are at least
500mm apart.
Check tightness of all connections in the boiler before firing.
Ensure that the terminals supplied are fitted to both the exhaust
and air inlet pipes.
The system must be free from air before firing.
Gravity circuits are not allowed.
WD180/0/99
KESTON CONDENSING BOILERS
IMPORTANT
KESTON 260 & 340
INSTALLATION KEY POINTS