Owner manual

KEYENCE CORPORATION. Vision System Division
7 www.keyence.com
Configuring the MP Series Settings
2
1
Enter "Project name", select the "PLC model", and then press "OK".
Start MPE720 with PLC connected to the computer, and select [File] > [New project]. Then enter a file name
and select a controller name to start a project.
3
Click controller No. "01" (the number the RS232 module is connected to) on the "Module Configuration"
screen in Engineering Manager. Then double-click SLOT No. 1 in "Module Details".
A detailed seng screen for the selected module appears.