Instructions / Assembly
5
INSTALLATION INSTRUCTIONS
PREPARE THE WINDOW 
11
3/4 (or 1/ )
Screws
 (7) 
2 
Lock Frame
 (2) 
 Sash Lock
 (1)
 Mounting Hardware
Window sash 
 seal foam
 (1)
PREPARE AIR CONDITIONER 
22
C: Align the hole in the top rail with those in the top 
 of the unit as shown in Fig.B
D: Secure the top rail to the unit with the 3/8 Screws 
 as shown in Fig.C.
NOTE: For safety reasons, all four(4) screws MUST 
 be securely fastened.
INSTALL THE ACCORDION PANELS
33
NOTE: Top rail and Sliding Panels at each side are 
offset to provide the proper pitch to the rear of (5/16  ). 
This is 
necessary for proper condensed water 
utilization and drainage. If you are not using the Side 
Panels for any reason, this pitch to the rear must be 
maintained. 
A.Place unit on floor, a bench or 
 a table. Hold the Accordion 
 Panel in one hand and gently 
 pull back the center to free the 
 open end. See Fig.1
Fig.1
Lower sash must open sufficiently to allow a clear 
vertical opening of 13 inches (330mm). Side louvers 
and the rear of the AC must have clear air space to 
allow enough airflow through the condenser, for heat 
removal. The rear of the unit must be outdoors, not 
inside a building or garage.
A: Remove the air conditioner from the carton and 
 place on a flat surface. 
B: Remove top rail and R1 hardware (R1 hardware 
 only for Energy star models) from the rear of the 
 packaging material as shown in Fig. A.
Packaging
Fig.
A
Top Rail
Fig.B
Fig.C
 Top Rail and R1 Hardware
3/8 Screws
 (4) 
 Top Rail
 (1)
or
3/8 Screws
 (4) 
 Top Rail
 (1)
or
R1 hardware
 R1 hardware 
 (2)
Weather
stripping
 (5)
(10 *3/4 *1/12 )
NOET: Weather stripping is only for Energy star
models.





