CEDAR SUMMIT PREMIUM MAIN CLUBHOUSE AND SWING – F24945 INSTALLATION AND OPERATING INSTRUCTIONS WARNING To reduce the risk of serious injury or death, you must read and follow these instructions. Keep and refer to these instructions often and give them to any future owner of this play system. Manufacturer contact information provided below. FOR OBSTACLE FREE SAFETY ZONE AND MAXIMUM NUMBER OF USERS SEE - Fort Guides in Main Clubhouse and Swing or Add On C instructions.
Warnings and Safe Play Instructions CONTINUOUS ADULT SUPERVISION REQUIRED. Most serious injuries and deaths on playground equipment have occurred while children were unsupervised! Our products are designed to meet mandatory and voluntary safety standards. Complying with all warnings and recommendations in these instructions will reduce the risk of serious or fatal injury to children using this play system.
Protective Surfacing - Reducing Risk of Serious Head Injury From Falls One of the most important things you can do to reduce the likelihood of serious head injuries is to install shock-absorbing protective surfacing under and around your play equipment. The protective surfacing should be applied to a depth that is suitable for the equipment height in accordance with ASTM F1292.
Instructions for Proper Maintenance Your Cedar Summit Play System is designed and constructed of quality materials with your child’s safety in mind. As with all outdoor products used by children, it will weather and wear. To maximize the enjoyment, safety and life of your Play Set, it is important that you, the owner, properly maintain it. Check the following at the beginning of the play season: GROUND STAKES (ANCHORS): Check for looseness, damage or deterioration.
About Our Wood Cedar Summit Premium Play Systems uses only premium playset lumber, ensuring the safest product for your children’s use. Although we take great care in selecting the best quality lumber available, wood is still a product of nature and susceptible to weathering which can change the appearance of your set.
Keys to Assembly Success Tools Required • Tape Measure • Carpenters Level • Carpenters Square • Claw Hammer • Standard or Cordless Drill Part Identification Key On each page, you will find the parts and quantities required to complete the assembly step illustrated on that page. Here is a sample.
5/16" (8mm) Flat Washer 1/4" (6mm) Lock Washer 5/16" (8mm) T-Nut 1/4" (6mm) T-Nut 1/4" (6mm) Flat Washer 5/16" (8mm) Flat Washer For example: BOLT LENGTH 4½ (4.5) inches long 1 inch = 25.4mm LENGTH CONVERSION 0.31 inches x 25.4mm = 8mm BOLT DIAMETER 5/16 (0.31) inches For example: 1 inch = 25.4mm DIAMETER CONVERSION HARDWARE LENGTH CHART inches vs millimetres 6 152 5½ 140 5 127 114 4½ 4 102 3½ 89 3 76 2½ 64 2 51 1½ 38 1¼ 32 1-1/8 29 1 25.4 7/8 22 3/4 19 1/2 12.
63.5 2 1/2" 5/4 x 3 88.9 3 1/2" 5/4 x 4 114.3 4 1/2" 5/4 x 5 139.7 5 1/2" 5/4 x 6 88.9 3 1/2" 4x4 38.1 1 1/2" 34.9 1 3/8" 34.9 1 3/8" 38.1 1 1/2" 38.1 1 1/2" 2x6 136.5 5 3/8" 2x4 85.7 3 3/8" 2x3 63.5 2 1/2" 2 x2 15.9 5/8" 82.6 3 1/4" 34.9 1 3/8" 60.3 2 3/8" 85.7 3 3/8" 114.3 4 1/2" 136.5 5 3/8" 1/2 x 4 1x2 1x3 1x4 1x5 1x6 LENGTH CONVERSION 1 inch = 25.4mm 59.25 inches x 25.4mm = 1505mm For example: BOARD LENGTH 59¼ (59.25) inches 15.9 5/8" 15.9 5/8" 15.9 5/8" 15.
Part Identification (Reduced Part Size) 2pc. - 2717 - Clock Block 3/4 x 1-3/4 x 9-3/4" Box 2 - 3632717 2pc. - 5536 - Counter Side 5/8 x 2 x 6-3/4" - Box 2 38045536 1pc. - 2686 - Counter Front 5/8 x 2¾ x 40-5/8" - Box 2 - 3632686 2pc. - 2716 - Counter Mid Top 1 x 4 x 17-5/8" - Box 2 - 3632716 Nominal Size 5/4 x 5 5/4 x 6 2x2 1x4 1x6 1-1/4 x 2-1/4 1-1/4 x 3 4x4 4x6 Actual Size 15/16 x 4-1/4 15/16 x 5-1/4 1-1/2 x 1-1/2 5/8 x 3-3/8 5/8 x 5-3/8 1-1/4 x 2-1/4 1-1/4 x 3 3x3 3 x 5-1/4 1pc.
Part Identification (Reduced Part Size) 2pc. - 2618 Front Back Panel 1¼ x 42 x 87" Box 2 - 37632618 1pc. - 2627 SW Wall Panel 1¼ x 42 x 87" Box 2 - 37632627 1pc. - 2639 Back Roof Panel 1¼ x 36¾ x 44" Box 2 - 37632639 1pc. - 2644 Front Roof Panel 1¼ x 37 x 44" Box 2 - 37632644 2pc. - 2719 Upper Window Insert 1.27 x 18.8 x 35.86" Box 2 - 37632719 1pc. - 2622 End Panel Assembly 1¼ x 42 x 87" Box 2 - 37632622 1pc. MOD 3 Pane Transom (2Pk) Box 2 - 3320538 1pc.
Hardware Identification (Actual Size) 5pc. LW2 - 5/16" Lock Washer - (51303300) 5pc. FW0 - 3/16" Flat Washer - (51103100) 10pc. TN1 - 1/4" T - Nut (54503200) 12pc. FW1 - 1/4" Flat Washer - (51103200) 8pc. TN2 - 5/16" T- Nut - (54503300) 15pc. LW1 - 1/4" Lock Washer - (51303200) 66pc. FW2 - 5/16" Flat Washer - (51103300) 29pc. LN2 - 5/16" Lock Nut - (54303300) 5pc. BN1 - 1/4" Barrel Nut - (54803200) 8pc. FW3 - #8 Flat Washer - (51003500) 5pc. PB2 - Pan Bolt 1/4 x 1-1/4" 1pc.
Hardware Identification (Actual Size) Box 1,2 of 6 16pc. WL5 - Wafer Lag 1/4 x 2-1/2" 3pc. WB7 - Wafer Bolt 5/16 x 3" - (53613330) - (52613222) 4pc. H1 - Hex Bolt 1/4 x 1-1/2" - (53703212) 2pc. H10 - Hex Bolt 1/4 x 2-1/4" - (53703221) 4pc. G8 - Hex Bolt 5/16 x 2" - (53703320) 4pc. H11 - Hex Bolt 1/4 x 2-3/4" - (53703223) 7pc. G21 - Hex Bolt 5/16 x 3-3/4" - (53703333) 3pc. G4 - Hex Bolt 5/16 x 4" - (53703340) 14pc. G7 - Hex Bolt 5/16 x 5-1/2" - (53703352) 2pc.
Part Identification (Reduced Part Size) 1x - Rural Mailbox (3320507) 1x - Cedar Summit ID Plaque (9320357) 1x - Clicker Phone (3320252) 1x - Peak Detail (2 Pk) (3320121) 1x - Base Clock (9320124) 1x - Chimney Wall (9320606) 1x - Clock Subset (3320329) 1x - Quick Link with Thread (6 Pk) (3206020) 1x - Rebar Ground Stake (6 Pk) (3200318) 1x - Rocks (5pk) (3320386) 1x - Cedar Summit Plaque (9320358) 2x - Jamb Mount (9206300) 1x - Welded Chain Bag (3200170) Green 2x 9201225 25" chain -Green 4x 920125
Step 1: Inventory Parts - Read This Before Starting Assembly STOP A. STOP STOP STOP his is the time for you to inventory all your hardware, wood and accessories, T referencing the parts identification sheets. This will assist you with your assembly. • The wood pieces will have the four digit key number stamped on the ends of the boards. The wood pieces are referenced throughout the instructions with this number. • Please refer to Page 6 for proper hardware assembly.
Step 2: Frame Assembly Part 1 It is important to assemble the frame on a flat, smooth surface. A: Place (2627) SW Wall Panel between 2 (2618) Front Back Panels noticing the panel orientations. The tops and bottoms of the panels should be flush.
Step 2: Frame Assembly Part 2 B: Place (2622) End Panel Assembly between both (2618) Front Back Panels noticing the panel orientations. The tops and bottoms of the panels should be flush. Make sure the panels are square then using the pilot holes as a guide pre-drill with a 3/16” drill bit and fasten the back (2618) Front Back Panel to (2622) End Panel Assembly and (2622) End Panel Assembly to the front (2618) Front Back Panel with 4 (WL5) 1/4 x 2-1/2” Wafer Lags per side. (fig. 2.4) Back Swing Side Fig.
Step 3: Floor Assembly Part 1 A: From inside the assembly centre (2608) Floor Joist over pilot holes in (2622) End Panel Assembly and (2627) SW Wall Panel, 5/8” down from the top of board then attach (2608) Floor Joist to each panel with 2 (S4) #8 x 3” Wood Screws per end. (fig.3.1, 3.2 and 3.3) S4 Fig. 3.1 2627 Top View 2608 Fig. 3.3 2608 S4 x 2 per side 2622 S4 2622 5/8” Fig. 3.
Step 3: Floor Assembly Part 2 B: On both (2618) Front Back Panels attach 1 (2610) Side Joist to the inside of each panel with 2 (H11) 1/4 x 2-3/4” Hex Bolts (with lock washer, flat washer and t-nut) and 4 (S3) #8 x 2-1/2” Wood Screws as shown in fig. 3.4 and 3.5. 2610 Fig. 3.4 2627 2618 2610 2618 2622 2610 Fig. 3.5 2618 1/4” Flat Washer 1/4” Lock Washer S3 1/4” T-Nut H11 S3 H11 S3 Hardware Wood Parts 2x 2610 Side Joist 2 x 2 x 40-1/4” •See details SIZE A DWG. NO.
Step 3: Floor Assembly Part 3 C: Starting at (2627) SW Wall Panel place (2648) Floor Board followed by 8 (2609) Floor Boards. Make sure all boards are evenly spaced then attach to (2608) Floor Joist and each (2610) Side Joist with 5 (S20) #8 x 1-3/8” Wood Screws per board. (fig. 3.6 and 3.7) 2627 2609 Fig. 3.6 2648 2622 Fig. 3.
Step 4: Attach SW Ground and Diagonal A: Loosely attach 1 (2606) SW Ground to each (2607) Diagonal with 1 (H10) 1/4 x 2-1/4” Hex Bolt (with lock washer, flat washer and t-nut) per board then place each (2607) Diagonal tight and flush to the front of (2627) SW Wall Panel. (2606) SW Grounds to be flush to the bottom of (2627) SW Wall Panel. (fig. 4.1 and 4.
Step 5: Swing Beam Assembly A: Attach 6 Swing Hangers to (2614) Engineered Beam using 2 (G7) 5/16 x 5-1/2” Hex Bolts (with 2 flat washers and 1 lock nut) per Swing Hanger, as shown in fig. 5.1. B: Flush to the Fort End of (2614) Engineered Beam attach 2 L-Beam Brackets with 2 (G21) 5/16 x 3-3/4” Hex Bolts (with 2 flat washers and 1 lock nut). (fig. 5.2) C: Install 1 (WB7) 5/16 x 3” Wafer Bolt (with flat washer and t-nut) in the middle bolt hole in (2614) Engineered Beam as shown in fig. 5.3.
Step 6: Swing End Assembly A: Loosely attach 2 (2613) Heavy SW Posts to (2615) SW Upright using 2 (G7) 5/16 x 5-1/2” Hex Bolts (with lock washer, flat washer and t-nut). Notice 2 bolt holes at top of (2615) SW Upright and orientation of angle. (fig. 6.1) B: Attach (2616) SW Support to both (2613) Heavy SW Posts and (2615) SW Upright using 3 (G4) 5/16 x 4” Hex Bolts (with lock washer, flat washer and t-nut). Tighten all bolts (fig. 6.
Step 7: Attach Swing End to Swing Beam A: Place Swing End Assembly against Swing Beam Assembly then place 1 Beam Bracket on each side of the assembly (they are specific for left and right side) and attach with 5 (G21) 5/16 x 3-3/4” Hex Bolts (with 2 flat washers and 1 lock nut). (fig. 7.1 and 7.2) Fig. 7.1 Swing Beam Assembly Beam Bracket Swing End Assembly Swing Beam Assembly Fig. 7.
Step 8: Attach Swing Assembly To Fort A: Place Swing Assembly against top of (2627) SW Wall Panel, make sure assembly is level then attach from inside the fort assembly into each L-Beam Bracket with 4 (G8) 5/16 x 2” Hex Bolts (with 2 flat washers and 1 lock nut). (fig. 8.1) L-Beam Bracket Fig. 8.1 2627 G8 Swing Assembly 5/16” Flat Washer 5/16” Lock Nut Hardware 4x G8 5/16 x 2” Hex Bolt (5/16” flat washer x 2, 5/16” lock nut) 24 support@cedarsummitplay.
Step 9: Install Ground Stakes MOVE FORT TO FINAL LOCATION PRIOR TO STAKING FINAL LOCATION MUST BE LEVEL GROUND A: In the 5 places shown in fig. 9.1 drive the Rebar Ground Stakes 13” into the ground against outside front corner of (2622) End Panel Assembly, on both (2607) Diagonals and both (2613) Heavy SW Posts. Be careful not to hit the washer while hammering stakes into the ground as this could cause the washer to break off. B: Attach ground stakes using 1 (S7) #12 x 2” Pan Screw per ground stake (fig. 9.
Steps 10 - 29 show how to assemble and install add-ons and inserts. Fort Guides show where to install them. FORT GUIDES: Page 60-61: McKinley Page 62-63: Willowbrook Page 64-65: Creston Lodge Page 66-67: Lewiston Retreat 26 support@cedarsummitplay.
Step 10: How to Install Inserts - Upper and Lower Jambs There are 2 (2601) Lower Jambs and 1 (2602) Upper Jamb provided with the Main Clubhouse and Swing. Depending on which fort you have purchased determines where they are installed on the (2622) End Panel Assembly or (2618) Front Back Panel, see Fort Guide. See below for different variations and how to attach the Jambs to the Panel. When installing you will need 2 Jamb Mounts per Jamb and 4 x (S0) #8 x 7/8” Truss Screws per Jamb Mount.
Step 11: How to Install Inserts - Window and Wall Inserts Part 1 There is 2 (2720) Lower Window Inserts, 2 (2719) Upper Window Inserts, 1 (2665) Half Wall Insert, 2 (649A) Short Half Walls and 1 MOD 3-Pane Transom provided with the Main Clubhouse and Swing. Depending on which fort you have purchased determines where they are installed, see Fort Guide. See below for how to attach each insert.
Step 11: How to Install Inserts - Window and Wall Inserts Part 2 Inside Views MOD 3-Pane Transom Tight 649A S0 2665 S0 Tight S0 Tight SIZE DWG. NO. REV. INSERTtoPANELAPREP A Flanges Details Use 5- #8 x 7/8" Truss to attach Window + 4 -#8 x 7/8" to attach SCALE:1:50 WEIGHT: SHEET 1 OF 1 WEIGHT: SCALE:1:50 SHEET 2 OF 2 wall panel ( first, install middle screw at top of Window) 29 support@cedarsummitplay.
Step 12: How to Install Inserts - Clock Assembly There is 1 Clock Set provided with the Main Clubhouse and Swing. Depending on which fort you have purchased determines where it is installed, see Fort Guide. See below for how to assemble and attach the Clock Set. When installing you will need the following: Base Clock, Clock Subset (includes minute and hour hands, clock adapter and clock screw), 2 (2717) Clock Blocks and 4 x (S20) #8 x 1-3/8” Wood Screws.
Step 13: Rock Wall Assembly Fig. 13.1 0349 2603 2603 2604 Note: The holes in the rock boards must orient to the top of the boards. 2604 2605 2604 S20 7-5/8” Approx x 4 per board Note: Gaps between boards 2-1/4”, not to exceed 2-3/8” Fig. 13.2 A: Lay 2 (0349) Rock Rails down, side by side with angled edges facing down. (fig. 13.1) B: Place (2605) Access Board on the bottom of each (0349) Rock Rail as shown in fig. 13.1.
Step 14: Attach Rock Wall Assembly to Fort Part 1 A: Place Rock Wall Assembly in opening shown on the Fort Guide and flush as shown below. Attach (0349) Rock Rails to panel using 4 (S11) #8 x 2” Wood Screws. (fig. 14.1 and 14.2) B: Attach 1 (2605) Access Board to top of Rock Wall Assembly, flush to top of (0349) Rock Rail using 4 (S20) #8 x 1-3/8” Wood Screws. (fig. 14.3) Fig. 14.2 Fig. 14.1 S11 Panel Panel Flush S11 S11 ½" Wood Screws to attach Rock Boards to Rails SIZE DWG. NO.
Step 14: Attach Rock Wall Assembly to Fort Part 2 C: Drive 1 Rebar Ground Stake 13” into the ground against outside (0349) Rock Rail then attach with 1 (S7) #12 x 2” Pan Screw. Be careful not to hit the washer while hammering stake into the ground as this could cause the washer to break off. (fig. 14.4 and 14.5) D: After driving stake into the ground, check for sharp edges caused by the impact of the hammer. Smooth any sharp edges from impact area and touch up with outdoor paint.
Step 15: Counter Assembly Part 1 A: Flush to each end and to the top of (2687) Counter Back attach 1 (5736) Counter Joist per end with 1 (S20) #8 x 1-3/8” Wood Screw per joist. Notice the remaining holes at the bottom of (2687) Counter Back. (fig. 15.1) B: Place the remaining 2 (5736) Counter Joists centred over the pilot holes in the middle of (2687) Counter Back and flush to the top of the board, then attach, in the top holes, with 1 (S20) #8 x 1-3/8” Wood Screw per joist. (fig. 15.1) Fig. 15.
Step 15: Counter Assembly Part 2 C: On the inside of the panel shown in the Fort Guide place Counter Assembly so the top of (2687) Counter Back is flush to the top of the opening then attach with 5 (S20) #8 x 1-3/8” Wood Screws. (fig. 15.2 and 15.3) Fig. 15.2 Outside View Panel SIZE A SCALE:1:50 Use 5 -#8 x 1-1/2" Wood Screws Fig. 15.3 Inside View DWG. NO. REV. Counter Prep WEIGHT: SHEET 2 OF 7 Flush 2687 S20 Panel Hardware 5x S20 #8 x 1-3/8” Wood Screw 35 support@cedarsummitplay.
Step 15: Counter Assembly Part 3 D: Place 1 (6136) Counter Brace flush to the front and outside edge of each outer (5736) Counter Joist and tight to the panel then attach with 2 (S3) #8 x 2-1/2” Wood Screws per brace. (fig. 15.4 and 15.5) Fig. 15.4 5736 5736 6136 6136 Panel 5736 Fig. 15.5 Flush 6136 S3 Panel Wood Parts 2x 6136 Counter Brace 1 x 2 x 12-9/16” Hardware 4x S3 #8 x 2-1/2” Wood Screw SIZE Use 4 -#8 x 2-1/2" Wood Screws to attach Counter Braces 36 A DWG. NO.
Step 15: Counter Assembly Part 4 E: Place (2686) Counter Front against (5736) Counter Joists so the ends are flush and the centre (5736) Counter Joists are centred over the pilot holes. Measure 5/8” down from the top of (2686) Counter Front on both ends and attach to the (5736) Counter Joists with 4 (S20) #8 X 1-3/8” Wood Screws. (fig. 15.6) Fig. 15.
Step 15: Counter Assembly Part 5 F: Tight to (2687) Counter Back attach (2685) Counter Top to each (5736) Counter Joist with 4 (TS) #6 x 30 mm Trim Screws. (fig. 15.7) G: Tight to (2685) Counter Top and flush to the outside edges of the outer (5736) Counter Joists attach 1 (5536) Counter Side per joist with 3 (TS) #6 x 30 mm Trim Screws per board. (fig. 15.
Step 15: Counter Assembly Part 6 J: Place Faucet and 2 Sink Knobs in opening of Sink and attach Sink Knobs with included hardware. (fig. 15.9) Important: Use a hand held screw driver and DO NOT over tighten. Fig. 15.9 Faucet Sink Knob Sink Knob Included hardware Other Parts 1 x Sink 2 x Sink Knobs 1 x Faucet 39 support@cedarsummitplay.
Step 15: Counter Assembly Part 7 K: Place Sink and Stove in the openings of the Counter Assembly then attach 4 Mount Clips with included hardware to the bottom of the Sink and Stove to secure in place. (fig. 15.10 and 15.11) Important: Use a hand held screw driver and DO NOT over tighten. Note: To remove the Sink or Stove loosen screw 1/4 turn then twist Mount Clips. Fig. 15.10 Sink Stove Mount Clip with hardware Mount Clip with hardware Fig. 15.
Step 16: Attach Utensil Shelf A: From inside the assembly, centred in the top of the opening of panel as shown in the Fort Guide, above the counter, attach Utensil Shelf with 2 (S13) #6 x 5/8” Pan Screws as shown in fig. 16.1 and 16.2. B: Attach Pot, Pan and Spatula to the Utensil Shelf. (fig. 16.1) Fig. 16.1 Panel Panel Fig. 16.2 Utensil Shelf Centred S13 Other Parts Hardware 2x S13 #6 x 5/8” Pan Screw Use 2 - #6 x 5/8 Pan Screw to attach to fort SIZE A DWG.
Step 17: Attach Door Components Part 1 A: On the inside of (2718) Door Window Panel measure 15” up from the bottom and attach Catch Plate flush to the edge using 2 (S18) #6 x 1” Wood Screws. (fig. 17.1) B: On the inside of (2718) Door Window Panel measure 22” up from the bottom and attach 1 Door Handle using 2 (S13) #6 x 5/8” Pan Screws. (fig. 17.1) Fig. 17.
Step 17: Attach Door Components Part 2 C: On the outside of the (2718) Door Window Panel attach the second Door Handle at approximately the same place as the one on the inside. Use 2 (S13) #6 x 5/8” Pan Screws. (fig. 17.2) D: On the opposite side of the Door Handle measure 5/8” from the top and bottom of (2718) Door Window Panel attach 2 Door Hinges on the outside using 3 (S13) # 6 x 5/8” Pan Screws per Hinge. (fig. 17.2 and 17.4) Note: Hinge stops must be tight to (2718) Door Window Panel. (fig. 17.
Step 18: Attach Door Assembly to Fort A: In the opening for the door as shown in the Fort Guides, measure 5/8” up from the bottom of the opening and maximum 5/8” from (2601) Lower Jamb or panel and attach the remaining side of the hinges to (2601) Lower Jamb or panel using 3 (S13) #6 x 5/8” Pan Screws per hinge. (fig. 18.1 and 18.2) Fig. 18.1 Outside View Panel 2601 or Panel Door Hinge Fig. 18.2 2601 5/8” top of door, when installing S13 5/8” SIZE A DWG. NO. SCALE:1:50 REV.
Step 19: Attach Door Stop A: In the notched out opening of (2715) Door Stop attach the Magnetic Catch using 2 (S18) #6 x 1” Wood Screws. (fig. 19.1) Important: Use a hand held screw driver and DO NOT over tighten. B: On the inside of the assembly, attach (2715) Door Stop to the panel with 3 (S11) #8 x 2” Wood Screws, making sure (2715) Door Stop overhangs the panel or (2601) Lower Jamb by 1-1/4” and is in position to receive the Catch Plate. (fig. 19.2 and 19.3). Fig. 19.1 Fig. 19.
Step 20: Attach Clicker Phone A: Using the Fort Guide to show location, on the (2601) Lower Jamb beside the Door Assembly install the Phone Base with 2 (S13) #6 x 5/8” Pan Screws then place the Clicker Phone in the Phone Base. (fig. 20.1 and 20.2) Fig. 20.1 Inside View 2601 Door Assembly 2601 Fig. 20.2 Clicker Phone S13 Clicker Phone Base Hardware 2x S13 #6 x 5/8” Pan Screw 46 Other Parts 1 x Clicker Phone Set support@cedarsummitplay.
Step 21: Attach Rural Mailbox Part 1 A: Using the Fort Guide to show location attach Mailbox Mount to fort with 3 (S10) #8 x 1” Pan Screws. (fig. 21.1) B: Attach Mailbox Door to Mailbox Bottom. (fig. 21.2) C: Using the screws provided with the mailbox set attach the sides together with 2 of the screws then attach the Flag to the side with the hole. (fig. 21.3) D: Place the Side Assembly on top of the Bottom Assembly, you will hear a click to know it is installed correctly. (fig. 21.4) Fig. 21.1 Fig. 21.
Step 21: Attach Rural Mailbox Part 2 E: Slide the Mailbox Assembly over the detents on the Mailbox Mount so the tabs are inserted into the Mailbox Bottom slots. This will lock it into place. (fig. 21.5, 21.6 and 21.7) Fig. 21.5 Fig. 21.6 Mail Box Mount Mailbox Assembly Tabs Mail Box Mount Fig. 21.7 Mailbox Bottom Slots 48 support@cedarsummitplay.
Step 22: Attach Slide to Fort Please note this slide is not used on the Creston Lodge Fort, please skip this step and refer to the instructions in the TNRIII Tube Slide box for assembly and installation. A: Place Slide in the centre of the opening as shown in the Fort Guide, pre-drill with a 1/8” drill bit then attach slide to fort through the panel using 3 (S7) #12 x 2” Pan Screws. (fig. 22.1 and 22.2) Fig. 22.1 S7 Slide S7 Fig. 22.
Step 23: Roof Support Assembly A: Attach 1 (2617) Roof Support to a second (2617) Roof Support at peak using 1 (S4) #8 x 3” Wood Screw. Repeat this step so there are 2 Roof Support Assemblies. (fig. 23.1 and 23.2) Roof Support Assembly Fig. 23.1 S4 2617 Fig. 23.2 S4 2617 Wood Parts 4x 2617 Roof Support 1-1/4 x 2-1/4 x 37-1/2” Hardware 2x S4 #8 x 3” Wood Screw 50 support@cedarsummitplay.
Step 24: Roof Assembly Part 1 A: Place (2644) Front Roof Panel against (2639) Back Roof Panel so the tops form a peak then tight to the inside edge of the outside slats attach 1 Narrow Angle Bracket per slat with 2 (S0) #8 x 7/8” Truss Screws per bracket. (fig. 24.1 and 24.2) B: Attach the third Narrow Angle Bracket centred on the middle slat with 2 (S0) #8 x 7/8” Truss Screws. (fig. 24.1 and 24.3) Centred Fig. 24.3 Narrow Angle Bracket Flush Fig. 24.
Step 24: Roof Assembly Part 2 C: Place 1 Roof Support Assembly against one side so the peaks meet and the ends of the roof supports are flush with the ends of the roof panels. Attach with 6 (S11) #8 x 2” Wood Screws. (fig. 24.4) D: Attach the second Roof Support Assembly on the opposite side, peaks to meet and ends are flush with 6 (S11) #8 x 2” Wood Screws. (fig. 24.4) S11 Fig. 24.
Step 25: Attach Peak Detail A: Attach 1 Peak Detail to the inside of the (2617) Roof Supports on each side of the Roof Assembly with 8 (S8) #12 x 3/4” Pan Screws (with 1/4” flat washer) per Peak Detail. (fig. 25.1 and 25.2) Peak Detail Fig. 25.1 2617 2617 Roof Assembly Peak Detail 2617 S8 Fig. 25.2 SIZE DWG. NO. A Roof Panel CONNECT A2 •Attach Chimney to roof using 2- #6 x 5/8" Pan Screws SCALE:1:50 WEIGHT: REV.
Step 26: Chimney Wall Assembly Part 1 A: Bend the Chimney Wall to form a box and insert tabs into slots. (fig. 26.1 and 26.2) B: Place the (7567) Chimney Top on top of the assembly and attach with 4 (S13) #6 x 5/8” Pan Screws. (fig. 26.3, 26.4 and 26.5) Tabs Fig. 26.1 Slots Fig. 26.2 Slots Chimney Wall Chimney Wall Tabs Fig. 26.3 Fig. 26.5 Fig. 26.4 SIZE A 7567 SCALE:1:50 Attach Chimney Wall 9320606 together mating both tabs to slots.
Step 26: Chimney Wall Assembly Part 2 C: Place the Chimney Wall Assembly centred on top of the Roof Assembly and attach with 2 (S13) #6 x 5/8” Pan Screws. (fig. 26.6 and 26.7) Fig. 26.6 Chimney Assembly Roof Assembly Chimney Assembly Fig. 26.7 Roof Assembly S13 x2 Hardware 2x S13 #6 x 5/8” Pan Screw 55 support@cedarsummitplay.
Step 27: Attach Roof Ends Use the reference guides below to determine where the (2646) Roof End and (2647) Roof End Left are attached. For Willowbrook and Lewiston Retreat use Ref #1. For McKinley and Creston Lodge use Ref #2. Note the TNRIII Tube Slide must be assembled and attached before the Roof Ends. See TNRIII Tube Slide instructions.
Step 28: Attach Roof Assembly to Fort A: With 2 people on the ground and at least 1 person in the fort, lift the Roof Assembly up and over the Back side of the fort. Guide the Roof Assembly onto the fort so all four (2617) Roof Supports sit flush to the front and outside edges of (2646) Roof End and (2647) Roof End Left. (fig. 28.1, 28.2 and 28.3) B: Attach (2617) Roof Supports to (2646) Roof End and (2647) Roof End Left with 1 (S3) #8 x 2-1/2” Wood Screw per support. (fig. 28.1, 28.2 and 28.3) Fig. 28.
Step 29: Attach Acro and Belt Swings A: Using 1 Threaded Clip per chain, join 1 Long Swing Chain to each side of the swing belt seat. Make sure to close the Threaded Clip tightly using an adjustable wrench. (fig. 29.1 and 29.2). B: Using 1 Threaded Clip per chain, join the Short Swing Chain to the Acro Bar and Acro Handle. Make sure to close the Threaded Clip tightly using an adjustable wrench. (fig. 29.2 and 29.
Final Step: Attach I.D. Plaque ATTACH THIS WARNING & I.D. PLAQUE TO THIS LOCATION ON YOUR PLAY EQUIPMENT! This provides warnings concerning safety and important contact information. A Tracking Number is provided to allow you to get critical information or order replacement parts for this specific model. ATTACH THIS WARNING & I.D. PLAQUE TO THIS LOCATION ON YOUR PLAY A: Attach Cedar EQUIPMENT! Summit I.D.
Fort Guide: McKinley MOD 3 Pane Transom 2719 2618 (Slide sold separately for instore purchases only) Front 2719 MOD 3 Pane Transom 17” 17” Clock Set 2720 2618 Clock Set Slide Position Rural Mailbox Rural Mailbox 2601 Clicker Phone 2720 Front Installation Door Assembly Door Assembly 2601 2719 2622 MOD 3 Pane Transom 2602 17” 17” MOD 3 Pane Transom 2665 2719 2602 Rock Wall Position Side Wall Installation 2622 2665 Rock Wall 60 support@cedarsummitplay.
Fort Guide: McKinley 2618 Deluxe Kitchen Set 649A 17” 17” 2618 Back 649A 649A 2601 2720 2720 2601 Roof Installation Peak Detail Back Installation Roof Assembly with Chimney 1 per side 26'- 3" 2647 1 per side 14'- 3" 11'-5" Maximum Number of Users: 9 2646 1 per side 61 28'-0" McKinley SIZ SIZE support@cedarsummitplay.
Fort Guide: Willowbrook 2719 2618 Clock Set Front 2601 2618 17” 17” 2720 2719 2719 Clock Set Rural Mailbox Position Clicker Phone 2720 Front Installation Door Assembly Rural Mailbox Door Assembly 2601 MOD 3-Pane Transom Slide sold separately for instore purchases only 2602 17” 17” 649A MOD 3-Pane Transom 2622 2602 Slide Position 2665 649A Side Wall Installation 2622 Deluxe Kitchen Set Position 2665 Deluxe Kitchen Set 62 support@cedarsummitplay.
Fort Guide: Willowbrook 2618 MOD 3-Pane Transom 649A Back 2618 MOD 3-Pane Transom 649A 17” Rock Wall Position 17” 2601 2720 Back Installation 2720 2601 Roof Installation Rock Wall Roof Assembly with Chimney Peak Detail 1 per side 30'- 4" 18'- 4" 28'-0" 7'-6" 2647 1 per side 2646 1 per side 63 Maximum Number of Users: 9 WILLOWBROOK support@cedarsummitplay.
Fort Guide: Creston Lodge MOD 3-Pane Transom 2618 2719 Clock Set Front MOD 3-Pane Transom 17” 17” 2719 2618 Clock Set Rock Wall Position 2601 Door Assembly Position 649A 649A 2601 Clicker Phone Front Installation MOD Side Lite Rock Wall Door Assembly 2602 Deluxe Kitchen Set 8935 9-5/8” 8934 2602 2622 2622 2665 8965 8963 TNR III Tube Slide TNR III Tube Slide instructions are in A24949 MOD Side Lite TNR III Tube Slide 8935 Side Wall Installation Deluxe Kitchen Set Position 266
Fort Guide: Creston Lodge MOD 3-Pane Transom 2618 649A 2719 MOD 3-Pane Transom 17” 17” 2601 Back 2719 649A Rural Mailbox Position 2618 2720 2601 Rural Mailbox Back Installation 2720 Roof Installation Roof Assembly with Chimney Peak Detail 1 per side 28'-8" 16'-8" 7'-6" 2647 1 per side 28'-0" Creston lodge 2646 1 per side Maximum Number of Users: 9 65 support@cedarsummitplay.
Fort Guide: Lewiston Retreat MOD 3-Pane Transom 2618 Clock Set Front 2719 MOD 3-Pane Transom 17” 17” 2719 2618 Clock Set Slide Position Door Assembly 2601 2720 2720 Clicker Phone Rural Mailbox Position 2601 Rural Mailbox Front Installation MOD Side Lite Door Assembly Slide sold separately for instore purchases only 2602 8935 9-5/8” 8934 2602 2622 2622 2665 8965 8963 TNR III Tube Slide TNR III Tube Slide TNR III Tube Slide instructions are in A24949 MOD Side Lite Side Wall Inst
Fort Guide: Lewiston Retreat MOD 3-Pane Transom 2719 2618 Back 2719 2601 2601 Deluxe Kitchen Set 17” 17” MOD 3-Pane Transom 2618 2720 649A Rock Wall Position 2720 Back Installation 649A Roof Installation Rock Wall Roof Assembly with Chimney Peak Detail 1 per side 28'-8" 16'-8" 11'-5" 2646 1 per side 2647 1 per side 67 Maximum Number of Users: 10 28'-0" LEWISTON RETR support@cedarsummitplay.
NOTES NOTES 68 support@cedarsummitplay.
NOTES NOTES 69 support@cedarsummitplay.
BIG BACKYARD Consumer Registration Card First Name Initial Last Name Street Apt. No.