Installation Manual

Kingfisher Company, inc. STAR-ELT Manual
KCi #99420-MAN Rev 0.6 Page 3 of 29
1. FCC Device Statements
FCC ID: AGJKCISTARELT0001
WARNING: Changes or modifications not expressly approved by Kingfisher Company, inc
could void the user's authority to operate this equipment and void the product warranty.
FCC Notice (for U.S. Customers):
This device complies with Part 15 of the FCC Rules:
Operation is subject to the following conditions:
1. This device many not cause harmful interference, and
2. This device must accept any interference received, Including interference that may cause
undesired operation
Changes and Modifications not expressly approved by Kingfisher Company, inc can void your
authority to operate this equipment under Federal Communications Commissions rules.
2. Caution
Risk of Electrical Shock
Read this manual completely before installing or servicing panels.
Chassis must be connected to earth ground.
Observe hot and neutral polarity when connecting AC power.
It is recommended to install conduit into the sides of the enclosure only
3. Site Selection
Locate and install the panel where least vibration or jarring will occur.
Mount panel on structurally sound wall.
Mount on a wall area where there is sufficient access to run the conduit for loop inputs,
antenna, AC Power, and Earth Ground.
Avoid installation in direct sunlight and in rain runoff paths.
Locate panel providing clear view of the indicators, door clearance, and ease of access.
Factory Mutual (FM Pending) approved for operation temperature range 0°C through
49°C (32°F - 120°F).
Factory Mutual (FM Pending) approved for operation humidity < 95% non-condensing.
Antenna gain shall not exceed zero dBd (referred to a half-wave dipole) in any horizontal
direction.
Only vertical polarization of antennas shall be permitted.
The antenna and its supporting structure must not exceed 6.1 m (20 feet) in height above
the ground