User's Manual

14
7. The unit will initialize itself in approximately 5 seconds. The blinking
CHECKING indicator will disappear when it is okay to proceed.
8. Once the initialization process is completed, adjust the Patch Antenna
direction such that it yields the maximum number of bars on the
SIGNAL meter shown in the circle below (Fig. 13.) Then tighten the
Adjustment Nut to lock the antenna in that position. This process
tunes the antenna for the best possible link with your carrier’s base
station.
9. Disconnect the AC Adapter from the AC outlet and move the Base
Amplier to a location centralized in the area you would like to improve
coverage. In most cases, this location should be at least 25 feet from
the Patch Antenna you just installed and near an AC outlet.
Figure 13
AC
Adapter
Cable
Patch
Antenna
Coax