Operation Manual

Installation Requirements
Tools and Parts
Ga
ther these required tools and parts before starting installation.
Read and follow the instructions provided with any tools listed
here.
Location Requirements
Parts
Supplied
Gas pressure regulator/hose assembly set for 11WCP LP
gas
Right side shelf
Left side shelf
AABattery (5)
Warming rack
Cooking grid
Grease box
Door hinges
Flame tamers
Natural gas orifice for sear side burner
5
Tools need
ed
Phillip screwdriver
Wrench or pliers
Pipe wrench
Scissors or cutting pliers (to
remove tiedowns)
Noncorrosive leak-detection
solution
Parts Needed
20 lb LP gas fuel tank-approximately 18” (45.7cm) height.
Parts Needed for Conversion to Natural Gas
Natural gas conversion kit Part Number 710-0003. See
“Assistance” section to order. The conversion kit includes:
Natural gas regulator 4" W.C. (marked “Natural Gas
Regulator”)
10 ft (3.0 m) Natural gas hose with quick connector
5.9" (150 mm) Natural gas regulator hose
6 mm nut driver
6 mm wrench
Hex key
Gas line shutoff valve
1/2" male pipe thread nipple for connection to pressure
regulator.
LP gas-resistant pipe-joint compound
CSA design-certified outdoor flexible stainless steel
appliance connector (4-5 ft [1.2-1.5 m]) or rigid gas supply
line as needed.
Select a location that provides minimum exposure to wind
and traffic paths. The location should be away from strong
draft areas.
Do not obstruct flow of combustion and ventilation air.
Clearance to combustible construction for grill:
A minimum of 24” (61 cm) must be maintained between
the front of the grill hood, sides and back of the grill
and any combustible construction.
A 24” (61 cm) minimum clearance must also be
maintained below the cooking surface, and the grill
shall not be used under overhead combustible
construction.
Rotisserie (accessory)*
If you equip your grill with a rotisserie, a 6" (15.2 cm)
minimum clearance is needed for the rotisserie motor.
A grounded, 3-prong outlet located to the left of the grill is
required.
*See “Assistance” section to order.