Owner's Manual
Table Of Contents
- REFRIGERATOR SAFETY
- Refrigerator Safety
- MODEL
- Models
- MAINTENANCE AND CARE
- Cleaning
- Changing LED Module_R_SXS_W11504344
- Refrigeration Shelves and Door Bins
- Sabbath and Vacation Care
- INSTALLATION REQUIREMENTS
- Tools and Parts
- Location Requirements
- Electrical Requirements
- Water Supply Requirements
- Tipping Radius
- Product Dimensions
- Door Swing Dimensions
- Overlay Series Door Panel and Cabinetry Clearance
- Overlay Series Custom Panels and Handle Kits
- Stainless Series Custom Side Panels
- INSTALLATION INSTRUCTIONS
- Unpack the Refrigerator
- Connect the Water Supply
- Plug in Refrigerator
- Move Refrigerator to Final Location
- Level and Align Refrigerator
- Install Overlay Series Custom Panels
- Adjust Doors
- Install Side Panel
- Install Base Grille
- Install Odor Absorber (on some models)
- Complete Installation
- Water System Preparation
- REFRIGERATOR FEATURES
- Water and Ice Dispensers
- Ice Maker and Storage Bin
- Setting Liters and Ounces
- Measured Fill
- Water Filtration System
- Freezer Shelves
- PERFORMANCE DATA SHEET
- Performance Data Sheet
- SECURITE DU REFRIGERATEUR
- Sécurité du réfrigérateur
- MODELE
- Modèles
- ENTRETIEN ET REPARATION
- Nettoyage
- Remplacer le module à DEL_R_SXS_W11504344
- Tablettes du réfrigérateur et balconnets de porte
- Mode Sabbat et entretien avant les vacances
- EXIGENCES D'INSTALLATION
- Outils et pièces
- Exigences d’emplacement
- Spécifications électriques
- Spécifications de l’alimentation en eau
- Rayon de basculement
- Dimensions du produit
- Dimensions pour l’ouverture des portes
- Dégagement des panneaux de porte de série Overlay et des armoires
- Panneaux personnalisés de série Overlay et ensembles de poignées
- Panneaux latéraux personnalisés Série Stainless
- INSTRUCTIONS D'INSTALLATION
- Déballage du réfrigérateur
- Raccordement à la canalisation d’eau
- Brancher le réfrigérateur
- Déplacement du réfrigérateur à son emplacement définitif
- Réglage de l’aplomb et alignement du réfrigérateur
- Installation des panneaux personnalisés de série Overlay
- Ajustement des portes
- Installation du panneau latéral
- Installation de la grille de la base
- Installer le filtre à odeurs (sur certains modèles)
- Achever l’installation
- Préparation du circuit d’eau
- CARACTERISTIQUES DU REFRIGERATEUR
- Distributeurs d’eau et de glaçons
- Machine à glaçons et bac d’entreposage
- Réglage en litres ou en onces
- Remplissage mesuré
- Système de filtration de l’eau
- Tablettes du congélateur
- FICHE DE DONNEES DE PERFORMANCE
- Fiche de données de performance
- Blank Page
- Blank Page
- Blank Page
- Blank Page
- Blank Page
- Blank Page
- Blank Page
25
1. Turn on the ice maker. Lower the wire shutoff arm as shown.
Please refer to “Ice Maker and Storage Bin” for further
instructions on the operation of your ice maker.
NOTE:
� Allow 24 hours to produce the first batch of ice.
� Allow 3 days to completely fill ice container.
� Depending on your model, you may want to select the
maximum ice feature to increase the production of ice.
REFRIGERATOR FEATURES
Water and Ice Dispensers
Please read before using the water system. Follow the directions
specific to your model.
Style 1 (Dispenser Models)
IMPORTANT:
� After connecting the refrigerator to a water source or replacing
the water filter, follow the steps below to make sure that the
water system is properly cleaned. This will flush air from the
filter and water dispensing system, and prepare the water filter
for use.
� Connect to potable water supply only.
Do not use with water that is microbiologically unsafe or of
unknown quality without adequate disinfection before or after the
system. Systems certified for cyst reduction may be used on
disinfected waters that may contain filterable cysts.
NOTE: If your model has a base grille filter system, make sure the
base grille filter is properly installed and the cap is in the horizontal
position.
1. Open the freezer door and turn off the ice maker. The ON/OFF
switch is located on the top right side of the freezer
compartment. Move the switch to the OFF (right) setting as
shown.
2. Use
a sturdy container to depress and hold the water
dispenser lever for 5 seconds, then release it for 5 seconds.
Repeat until water begins to flow. Once water begins to flow,
continue depressing and releasing the dispenser lever
(5 seconds on, 5 seconds off) until a total of 3 gallons (12 L)
has been dispensed. This will flush air from the filter and
water dispensing system and prepare the water filter for use.
Additional flushing may be required in some households.
NOTE: As air is cleared from the system, water may spurt out
of the dispenser.
3. Open the freezer door and turn on the ice maker. Move the
switch to the ON (left) position.
Notes:
� Allow 24 hours to produce the first batch of ice.
� Discard the first three batches of ice produced.
� Allow 3 days to completely fill ice container.
Style 2 (Non-Dispenser Models)
IMPORTANT: After connecting the refrigerator to a water source
or replacing the water filter, fill and discard two full containers of
ice to prepare the water filter for use, before using the ice.
Do not use with water that is microbiologically unsafe or of
unknown quality without adequate disinfection before or after the
system. Systems certified for cyst reduction may be used on
disinfected waters that may contain filterable cysts.
NOTE: If your model has a base grille filter system, make sure the
base grille filter is properly installed and the cap is in the horizontal
position.
1. For icemakers with a switch, use the switch to turn ON or Off
the icemaker.
Without switch With switch
Notes:
� Allow 24 hours to produce the first batch of ice.
� Allow 3 days to completely fill ice container.
� Depending on your model, you may want to select the
maximum ice feature to increase the production of ice.
IMPORTANT:
� After connecting the refrigerator to a water source or replacing
the water filter, flush the water system. Use a sturdy container
to depress and hold the water dispenser lever for 5 seconds,
then release it for 5 seconds. Repeat until water begins to flow.
Once water begins to flow, continue depressing and releasing
the dispenser lever (5 seconds on, 5 seconds off) until a total of
3 gallons (12 L) has been dispensed. This will flush air from the
filter and water dispensing system, and prepare the water filter
for use. Additional flushing may be required in some
households.
NOTE: As air is cleared from the system, water may spurt out
of the dispenser.
� Allow 24 hours for the refrigerator to cool down and chill water.
� Allow 24 hours to produce the first batch of ice. Discard the first
three batches of ice produced.
� The dispensing system will not operate when the freezer door
is open.
� Depending on your model, your water and ice dispensers may
have one or more of the following features: A dispenser tray, a
special light that turns on when you use the dispenser, or a
lock option to avoid unintentional dispensing.