Installation guide

Concrete
Slab
Installations
-
Exhaust
Through
Wall
A.
Wall
cap
B.
6"
(15.2
cm)
round
metal
vent
C.
16"
(40.6
cm)
maximum
D.
6"
(15.2
cm)
round
PVC
sewer
pipe
E.5"
to
6"
(12.7
cm
to
15.2
cm)
transition
F.
6"
(15.2
cm)
round
metal
duct
G. 6"
(15.2
cm)
round
PVC
coupling
H.
Concrete
slab
1.6"
(15.2
cm)
round
PVC
sewer
pipe
J.
6"
(15.2
cm)
round
90°
PVC
sewer
pipe
elbow
K.
Tightly
pack
gravel
or
sand
completely
around
pipe.
L.
30
ft
(9.1
m)
max.
M.
6"
(15.2
cm)
round
90°
PVC
sewer
pipe
elbow
N.
6"
(15.2
cm)
round
PVC
coupling
O.
12"
(30.5
cm)
minimum
Calculating
Vent
System
Length
To
calculate
the
length
of
the
system
you
need,
add
the
equivalent
feet
(meters)
for
each
vent
piece
used
in
the
system.
6"
(15.2
cm)
to
3%"
x
10"
1
ft
(8.3
cm
x
25.4
cm)
transition
(0.3
m)
3%"
x
10"
(8.3cmx25.4cm)
9.0
ft
to 6"
(15.2
cm)
90°
elbow
(2.7
m)
transition
6"
(15.2
cm)
to
3%"
x
10"
5.0
ft
(8.3
cm
x
25.4
cm)
90°
elbow
(1.5
m)
transition
3%"
x
10"
(8.3
cm
x
25.4cm)
5.0
ft
90°
elbow
(1.5
m)
3%"
x
10"
(8.3cmx25.4cm)
12.0
ft
flat
elbow
(3.7
m)
3%"
x
10"
(8.3cmx25.4cm)
0.0
ft
wall
cap
(0.0
m)
5"
to
6"
(12.7
cmto
15.2
cm)
1
ft
transition
(0.3
m)
Vent
Piece
6"
(15.2
cm)
Round
45°
elbow
2.5
ft
(0.8
m)
90°
elbow
5.0
ft
(1.5
m)
6"
(15.2
cm)
0.0
ft
wall
cap
(0.0
m)
3%"
x
10"
(8.3cmx25.4cm)
4.5
ft
to
6"
(15.2
cm)
transition
(1.4m)
Example
vent
system
90°
elbow
wall
cap
<——
6ft.8m)
|
\
N
4
2
tt
(0.6
m)
1-
90°
elbow
=
5
ft
(1.5m)
8
ft
(2.4
m)
straight
=
8
ft
(2.4
m)
1
-
wall
cap
=
0
ft(0m)
System
length
=
13
ft
(3.9
m)
NOTE:
Flexible
vent
is
not
recommended.
Flexible
vent
creates
back
pressure
and
air
turbulence
that
greatly
reduce
performance.